A Day-Ahead Economic Dispatch Method for Virtual Power Plant

A virtual power plant and electricity price technology, applied in data processing applications, instruments, forecasting, etc., can solve problems such as large fluctuations, inability to ensure system security, and heavy computing burdens

Active Publication Date: 2017-09-19
HOHAI UNIV
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the prediction accuracy of wind turbine output is generally low, and the fluctuation between the actual output and the predicted output is relatively large. This kind of uncertainty problem is more suitable for the robust optimization method to deal with. If the stochastic programming method is used to deal with it, a large number of factors need to be considered Scheme samples, the calculation burden is heavy, and the decision-making scheme cannot guarantee the security of the system well

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Day-Ahead Economic Dispatch Method for Virtual Power Plant
  • A Day-Ahead Economic Dispatch Method for Virtual Power Plant
  • A Day-Ahead Economic Dispatch Method for Virtual Power Plant

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] Below in conjunction with accompanying drawing and specific embodiment, further illustrate the present invention, should be understood that these embodiments are only for illustrating the present invention and are not intended to limit the scope of the present invention, after having read the present invention, those skilled in the art will understand various aspects of the present invention Modifications in equivalent forms all fall within the scope defined by the appended claims of this application.

[0067] Such as figure 1 As shown, a kind of day-ahead economic scheduling method for virtual power plant of the present invention comprises:

[0068] Step 1), establish the mixed integer linear programming mathematical model of the day-ahead economic dispatch of the virtual power plant. In the objective function, the stochastic programming method is used to deal with the uncertainty of the electricity price. The objective function of the mathematical model is:

[0069] ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a day-ahead economic dispatch method for a virtual power plant. The method includes the following steps that first, a day-ahead economic dispatch mixed integer linear programming mathematical model making benefits of the virtual power plant maximum is built, and in an objective function, a stochastic programming method is adopted for handling the uncertainty of electricity price; second, constraint conditions are built to make an electric power system meet power constraint, unit operation constraint and contract electric quantity constraint, and in the constraint conditions, a robust optimization method is adopted for handling the uncertainty of generated output of renewable energy; third, a prediction error coefficient and a robust coefficient are set; fourth, calculation software is used for obtaining an optimum day-ahead economic dispatch result. Compared with the prior part, the method has the advantages of being good in calculation result, high in calculation efficiency and the like.

Description

technical field [0001] The invention relates to a day-ahead economic scheduling method for a virtual power plant, belonging to the field of power system scheduling. Background technique [0002] In recent years, fossil fuels have become increasingly scarce and environmental pollution has intensified. In order to solve the above problems, renewable energy power generation, especially wind power and photovoltaic power generation, has developed rapidly. Although the power generation reserves of renewable energy are huge and clean, they often have strong randomness, and grid connection alone will have a great impact on the grid, which is not conducive to the stable operation of the grid. In the electricity market environment, the market activities of wind farms are very risky, and their actual power generation often deviates from the bidding power, thus suffering from imbalance penalties, so they are at a disadvantage in the competition with traditional power plants. However, t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q50/06
CPCY02E40/70Y04S10/50
Inventor 卫志农余爽滕德红孙国强孙永辉
Owner HOHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products