Problems solved by technology

[0003] Its disadvantage is that filling construction cannot be done in the middle of the water body, and it cannot be directly filled under the premise of strong water impact and erosion, and it is impossible to directly build linear filling such as temporary roads entering the site under the premise of strong water impact and erosion. Construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary road construction method in water scour area
  • Temporary road construction method in water scour area
  • Temporary road construction method in water scour area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0023] The construction method of the water-retaining shoulder of the temporary road near the water includes the following steps:

[0024] A. Level the ground that needs to be paved to form a roadbed 2;

[0025] B. Lay grid material 5 along the water flow direction on the water-facing side of the subgrade 2;

[0026] C. Pull up the four sides of the mesh material 5 with ropes;

[0027] D. Pour the filling material 6 into the grid material 5, flatten the upper surface of the filling material 6 and stack the filling material 6 on the water side;

[0028] E. Pull the four sides of the grid material 5 towards the middle and connect them to each other so that the grid material 5 wraps the filler 6 to form a water retaining cage 3;

[0029] F, compacting water retaining cage 3;

[0030] G. Steps B to F are repeated, a plurality of water retaining...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a temporary road construction method suitable for a water scouring area, relates to the field of a road construction method, and provides a temporary road construction method which can be carried out in a water scouring area. The construction method for a water-retaining road shoulder of a temporary road by the water comprises the following steps: A, leveling the ground on which a road is to be paved to form a roadbed; B, laying a grid material on the water side of the roadbed along the water direction; C, pulling up four edges of the grid material by ropes; D, pouring filling materials into the grid material, leveling the upper surface of the filling materials, and stacking the filling materials at the water side; E, drawing the four edges of the grid material towards the middle and connecting with one another, so that the filling materials are wrapped by the grid material to form a water baffle cage; F, ramming the water baffle cage; G, repeating the steps B to F, forming a plurality of water baffle cages along the water direction, and laminating a plurality of layers of water baffle cages, thereby forming the water-retaining road shoulder by the water baffle cages together; and H, carrying out road construction. Temporary road construction can be carried out according to a conventional method after water is baffled by the water-retaining road shoulder.

Description

technical field [0001] The invention relates to the field of road construction methods, in particular to a temporary road construction method in water scoured areas. Background technique [0002] The current construction method of the temporary road is: use ordinary geonetwork to lay layer by layer in the backfill body, and under the premise of reasonable gradation and moisture content, layered compaction, the advantage is that the compressive strength and internal friction angle of the backfill body can be improved , to improve the stacking angle of the backfill body, minimize the occupied area and increase the use area of ​​the upper surface of the backfill body, it has an irreplaceable position for high-fill roadbeds or squares or other projects. [0003] Its disadvantage is that filling construction cannot be done in the middle of the water body, and it cannot be directly filled under the premise of strong water impact and erosion, and it is impossible to directly build ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01C9/08E02B3/18
Inventor 唐锐敏王润厚陈波
Owner SICHUAN SUNTANG CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products