Electric transmission line carbon fiber composite core manufacturing method
A technology for power transmission lines and manufacturing methods, applied in the direction of cable/conductor manufacturing, circuits, electrical components, etc., to achieve the effects of weight reduction, high conductivity, and reasonable equipment configuration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A method for manufacturing a carbon fiber composite core for a power transmission line, comprising the steps of:
[0032] Step 1: Provide a carbon fiber composite core manufacturing equipment for power transmission lines, the equipment includes: creel, yarn collector, dehumidifier, carbon fiber impregnator, high-strength glass fiber impregnator, front mold yarn guide, front mold , front mold heater, front mold yarn splitter, rear mold yarn guide, heater, rear mold, post curing heater, air cooling device;
[0033] Step 2: Pretreatment: adjust the tension and straightness of carbon fiber and high-strength glass fiber or basalt fiber, so that the tension of carbon fiber and high-strength glass fiber or basalt fiber is consistent and meets the process requirements, with good straightness;
[0034] Step 3: Dehumidification: pull out carbon fiber and high-strength glass fiber or basalt fiber from the creel at a constant speed, let it pass through the yarn collector and enter ...
Embodiment 2
[0042] In this embodiment, except for the following process conditions, other process steps are the same as in Example 1.
[0043] In step 3, the fiber moisture content is not more than 3%;
[0044] In step 4, the moving speed of the immersion coating is controlled at 400mm / min;
[0045] In step 5, the heating temperature of one section close to the front mold yarn guide is 35°C, the heating temperature of the other section is 70°C, and the distance between the two heating sections is kept at 20cm;
[0046] In step 7, the heating temperature distribution of the three heating zones is 95°C, 165°C and 155°C, and the intervals between the three heating zones are 20cm;
[0047] In step 8, the post-curing temperature is 180° C., and the post-curing time is 3 minutes.
Embodiment 3
[0049] In this embodiment, except for the following process conditions, other process steps are the same as in Example 1.
[0050] In step 3, the fiber moisture content is not more than 3%;
[0051] In step 4, the moving speed of the immersion coating is controlled at 600mm / min;
[0052] In step 5, the heating temperature of the section close to the front mold yarn guide is 45°C, the heating temperature of the other section is 90°C, and the distance between the two heating sections is kept 40cm;
[0053] In step 7, the heating temperature distribution of the three heating zones is 110°C, 175°C and 170°C, and the intervals between the three heating zones are 40cm;
[0054] In step 8, the post-curing temperature is 200° C., and the post-curing time is 8 minutes.
PUM
Property | Measurement | Unit |
---|---|---|
tensile strength | aaaaa | aaaaa |
shear strength | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com