Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Horizontal steel tube occluding water blocking tube curtain and construction method thereof

A technology for water-stop pipes and steel pipes, which is used in infrastructure engineering, construction, etc., can solve the problems of soil that cannot be consolidated, water-stop enclosures, and fully-closed enclosures cannot be formed, and achieves the effect of reducing construction procedures.

Active Publication Date: 2013-09-04
CHINA RAILWAY FIRST GRP CO LTD +1
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] When the highest tide level of seawater is higher than the lower end of the pipe shed, the use of pipe shed to stop water has the following disadvantages: (1) The horizontal steel pipes in the pipe shed are not connected to each other and cannot form a fully enclosed enclosure. Grouting is required to make the enclosure The rock is consolidated to form a water-stop enclosure. Due to the influence of seawater tides, the grout injected into the pipe shed steel pipe will be lost. It may exist that the soil between the pipe shed steel pipes cannot be consolidated, and a good water-stop enclosure cannot really be formed. Case
(2) In the case where the pipe shed curtain fails to form a good effect, the full-section pouring of the surrounding rock in the pipe shed will also be affected by the sea tide, and the cement slurry will be lost from the pipe shed, which cannot be achieved. The effect of partial surrounding rock consolidation
In short, the pipe shed cannot fully play the role of water-stop and reinforcement of the surrounding rock in the construction of the municipal road underpass in the sandstone stratum under the offshore shallow buried permeable geological conditions.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal steel tube occluding water blocking tube curtain and construction method thereof
  • Horizontal steel tube occluding water blocking tube curtain and construction method thereof
  • Horizontal steel tube occluding water blocking tube curtain and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The cross-sectional structure of an embodiment of the horizontal steel pipe interlocking water-stop pipe curtain of the present invention, as figure 2 Shown: the sand and gravel formation 1 below the municipal road 2 surrounds the channel 13 and builds a horizontal steel pipe interlocking water-stop pipe curtain 3 composed of a plurality of horizontal steel pipes. Among these horizontal steel pipes, there is a reference occlusal steel pipe 31, a plurality of unidirectional occlusal steel pipes 32 and a two-way occlusal steel pipe 33, which are connected in turn to form an annular enclosure that can surround the underpass 13 of the road; The spaces on the left and right sides and the inner holes of all the one-way occlusal steel pipes 32 are filled with cement mortar.

[0043] Please see image 3 , the inner hole of the standard interlocking steel pipe 31 is provided with a vertical plate 312 connecting the upper and lower surfaces of the inner wall, and the vertical p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a horizontal steel tube occluding water blocking tube curtain and construction method of the horizontal steel tube occluding water blocking tube curtain, and relates to a waterproof structure of an underground passage and a construction method of the waterproof structure. Horizontal steel tubes of the horizontal steel tube occluding water blocking tube curtain comprises a reference occluding steel tube, a bidirectional occluding steel tube and a plurality of unidirectional occluding steel tubes, and the reference occluding steel tube, the bidirectional occluding steel tube and the unidirectional occluding steel tubes are connected in sequence to form an annular surrounding curtain which surrounds a road underneath passing passage. A stand plate is arranged in the reference occluding steel tube and divides the inner hole of the occluding steel tube into a left space and a right space. Inserting grooves are formed in the left side and the right side of the reference occluding steel tube respectively. T-shaped wing plates are arranged on the left side and the right side of the bidirectional occluding steel tube respectively, a T-shaped wing plate is arranged on the left side of each unidirectional occluding steel tube, and an inserting groove is formed in the right side of each unidirectional occluding steel tube. The wing plate of a first unidirectional occluding steel tube is inserted into the right space on the right side of the reference occluding steel tube, and the wing plate of each of the rest unidirectional occluding steel tubes is inserted into the inner hole of the unidirectional occluding steel tube ahead. The wing plates on the two sides of the bidirectional occluding steel tube are inserted into the inner hole of a last unidirectional occluding steel tube and the left space in the left side of the reference occluding steel tube respectively. The reference occluding steel tube and the inner holes of all the unidirectional occluding steel tubes are all filled with cement mortar.

Description

technical field [0001] The invention relates to a waterproof structure of an underground passage and a construction method thereof. Background technique [0002] When constructing the underpass tunnel of the municipal road in the sandstone stratum under the existing offshore shallow buried water-permeable geological conditions, it is necessary to first carry out the water sealing and reinforcement of the surrounding rock, and then excavate the surrounding rock and soil of the underpass tunnel, and follow up the underpass in time Construction of the second lining structure of the passage tunnel. A typical water-stop reinforcement construction method for surrounding rocks is to use multiple horizontal steel pipes to build pipe sheds in sandstone formations. The structure of the pipe shed, such as figure 1 Shown: the sand and gravel formation 10 below the municipal road 20 is drilled around the upper part and both sides of the channel 130, and horizontal steel pipes 30 are re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/18
Inventor 李宏涛韩军鹏陈宽张臻
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products