Earthworm cultivating method
A breeding method and technology of earthworms, applied in the field of animal breeding, can solve the problems of not bright enough color on the body surface, unfavorable work efficiency, low high-quality protein rate, etc., and achieve the effects of bright color, avoiding separation work, and high egg-laying rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Example 1: Choose an open area close to the water source, convenient for drainage, ventilated, and far from the urban area to prepare an earthworm bed with cow dung or pig dung. The earthworm bed is a long strip with a trapezoidal cross section, 1m high, 40m long, and has a trapezoidal cross section. The width of the bottom is 1m, the width of the bottom is 1.5m, and the distance between adjacent earthworm beds is 3m. There can be a drainage ditch with a width of 0.5m between adjacent earthworm beds, and a pedestrian passage with a width of 1m on both sides of the earthworm bed. A awning is set up above the earthworm bed, a water delivery pipe is laid at the center of the top of the earthworm bed, and water spray holes are set on the water delivery pipe. The water jet holes are evenly distributed on both sides of the water delivery pipe. The distance between the water jet holes is 0.2m; Put the earthworm species in the middle of the earthworm bed, the amount of earthworm ...
Embodiment 2
[0016] Example 2: Choose an open area close to the water source, convenient for drainage, ventilated, and far from the urban area to prepare an earthworm bed with cow dung or pig dung. The earthworm bed is a long strip with a trapezoidal cross section, 1.3m high, 50m long, and trapezoidal cross-section The upper bottom is 1.5m wide and the lower bottom is 2m wide. The distance between adjacent earthworm beds is 4m. A drainage ditch with a width of 0.7m can be set between adjacent earthworm beds. A pedestrian passage with a width of 1.5m is provided on both sides of the earthworm bed. Then set up a awning above the earthworm bed, lay a water delivery pipe in the center of the top of the earthworm bed, and set up spray holes on the water delivery pipe. The spray holes are evenly distributed on both sides of the water delivery pipe. The distance between the two spray holes is 0.25 m; Put the earthworm species in the middle of the earthworm bed, the amount of earthworm species is 0....
Embodiment 3
[0017] Example 3: Choose an open area close to the water source, convenient for drainage, ventilated, and far from the urban area to prepare an earthworm bed with cow dung or pig dung. The earthworm bed is a long strip with a trapezoidal cross section, 1.5m high, 60m long, and a trapezoidal cross-section The upper bottom is 2m wide, the lower bottom is 3.5m wide, and the distance between adjacent earthworm beds is 5m. A drainage ditch with a width of 1.0 m can be set between adjacent earthworm beds. A pedestrian passage with a width of 2.0m can be provided on both sides of the earthworm bed. Then set up an awning above the earthworm bed, lay a water delivery pipeline in the center of the top of the earthworm bed, and set up spray holes on the water delivery pipeline. The spray holes are evenly distributed on both sides of the water delivery pipeline. The distance between the spray holes is 0.3 m; Put the earthworm species into the middle of the earthworm bed, the amount of earth...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com