Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Combined steel plate pile construction guide frame and construction method of combined steel plate pile

A technology combining steel sheet piles and construction methods, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of high locking friction resistance, slow construction speed, and difficult construction at the joints of steel sheet piles and steel pipe piles , to achieve the effect of simple positioning operation, reduced intermediate links, and convenient construction

Active Publication Date: 2015-07-22
CCCC SHEC FOURTH ENG +2
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction of the combined steel sheet pile of this structure is difficult: 1. The steel sheet pile and the steel sheet pile are tens of meters long, and the pile is very long, so the construction is difficult; 2. The pile position and verticality require high precision, and the connection between the steel sheet pile and the steel pipe pile Large lock friction resistance
The overall construction speed of steel pipe piles and steel plates is slow, which affects the overall construction progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Combined steel plate pile construction guide frame and construction method of combined steel plate pile
  • Combined steel plate pile construction guide frame and construction method of combined steel plate pile
  • Combined steel plate pile construction guide frame and construction method of combined steel plate pile

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The specific implementation manner of the present invention will be described in further detail below by describing the embodiments with reference to the accompanying drawings.

[0035] Such as Figure 1 to Figure 5 As shown, a combined steel sheet pile includes a steel pipe pile 1 and a steel sheet pile 2, the steel pipe pile 1 and the steel sheet pile 2 are two independent parts, and the steel pipe pile 1 and the steel sheet pile 2 are connected by an assembled lock 3 connect.

[0036] Specifically, two steel pipe pile locks are arranged on the outer wall of the steel pipe pile 1, and the two steel pipe pile locks are arranged symmetrically. Both ends of the steel sheet pile 2 are provided with steel sheet pile locks, and the steel pipe pile locks are matched with the steel sheet pile locks, leaving a certain fine-tuning gap after the matching.

[0037] The steel sheet pile is a steel sheet structure, and a concave structure is provided in the middle of the steel sh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a combined steel plate construction guide frame and a construction method of a combined steel plate pile. The construction guide frame comprises a guide frame main body frame structure, a positioning fine tuning system and an anchor pile, wherein the anchor pile is connected with the guide frame main body frame structure, the positioning fine tuning system is in a bi-layer structure, and the bi-layer structure is respectively arranged at the upper portion and the lower portion of the guide frame main body frame structure. The construction guide frame has functions of self stable, bi-layer of upper and lower and bi-direction of guiding and positioning, and secondary positioning, namely, after the construction guide frame positions one time and the steel pipe piles are inserted, the opposite position of each steel pipe pile can not be guaranteed, thus by means of secondary positioning and fine tuning, accurate positioning is guaranteed. Due to the adoption of a frame structure, the construction guide frame has the advantages of being enough in rigidness and intensity, capable of being hoisted integrally, fast, convenient, simple in positioning and operation, relatively convenient when people constructs, and capable of reducing intermediate links.

Description

technical field [0001] The invention relates to the technical field of pile foundation construction, in particular to a combined steel sheet pile construction guide frame and a combined steel sheet pile construction method. Background technique [0002] The shipping basin of the port includes water track and land track. Among them, in order to prevent water seepage and soil leakage, the water track foundation harbor pool wall adopts a combined steel sheet pile structure. [0003] Most of the existing combined steel sheet pile structures are steel pipe piles with locks welded on them, and the steel pipe piles and steel sheet piles are connected through the lock buckles on the steel pipe piles to form a combined steel sheet pile structure. The construction of the combined steel sheet pile of this structure is difficult: 1. The steel sheet pile and the steel sheet pile are tens of meters long, and the pile is very long, so the construction is difficult; 2. The pile position an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D13/04E02D7/18
Inventor 张鸿李宗平何超然汤宗祥虞锁敏翟宗刚汪文彬周燕青彭鹏
Owner CCCC SHEC FOURTH ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products