Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable

A grouting anchor cable, hollow technology, applied in mining equipment, earthwork drilling, installation of anchor rods, etc., can solve the problem of insignificant technical effect, and can solve the problem of large deformation of roadway, improve integrity, and reduce roadway support. cost effect

Inactive Publication Date: 2013-05-01
CHINA UNIV OF MINING & TECH +1
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve the problem that the effect of the existing technology for controlling the deformation of the surrounding rock in cross mining roadways is not obvious, the present invention provides a hollow grouting anchor cable to control multiple cross mining roadways The method of surrounding rock deformation, this method combines the supporting function of the anchor cable with the effect of grouting reinforcement, and works together on the surrounding rock of the roadway. The anchoring is reliable, and the grout can penetrate into a large range of surrounding rock around the drill hole, which can bond and solidify the loose and broken surrounding rock, significantly improve its integrity, improve the self-supporting ability of the surrounding rock, and thus greatly improve the roadway The support effect is a very good form of active support

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable
  • Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In the figure, the roadway in this example is a floor roadway with an inclination angle of 13°. The section of the repaired roadway is: bottom width×middle height=4100mm×3350mm, affected by at least 3 times of cross mining on the overlying working face, the hollow injection molding method of the present invention is used. The method of controlling the deformation of the surrounding rock of the multiple-span mining roadway by the slurry anchor cable, the specific implementation steps are as follows:

[0022] (1) Repair and expand the section 3 of the roadway. One month after the primary support and shallow hole grouting are completed, Φ22mm high-performance prestressed anchor rods 2 are used to strengthen the support of the 300m ahead working face in the roadway on the mining floor. , the row spacing is 800mm×800mm, all of which are arranged in the space of the primary support bolts, and the metal mesh 4 is laid on the entire section of the roadway at the same time, s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for controlling surrounding rock deformation of a gateway subjected to repeated overhead mining by using a hollow grouting anchor cable. The method comprises the following implementation steps of: performing repair brushing on the section of the gateway, reinforcing support in a bottom plate gateway to be mined in an advance face which is 280-320 meters in range by adopting high-performance pre-stressed anchor rods, and meanwhile, arranging a metal net on the entire section of the gateway; arranging a novel hollow grouting anchor cable between a top plate of the gateway and the high-performance pre-stressed anchor rods on both sides; grouting on the surface of the surrounding rock of the gateway for enclosing; and injecting a grouting material into the hollow grouting anchor cable. The method has the characteristics of high setting load, sudden increase in resistance and high bearing capability, the problems of high gateway deformation, strong heaving floors and difficulty in maintaining can be well solved, the gateway repair times are reduced, and the gateway support cost is reduced effectively; and the method is particularly suitable for solving the problems of rapid attenuation and loss of anchoring force caused by looseness, breakage and large deformation of surrounding rock due to repeated overhead mining on the gateway.

Description

technical field [0001] The invention relates to a method for reinforcing roadways affected by multiple cross-cuts in underground mines, in particular to a method for controlling the deformation of surrounding rocks in roadways with multiple cross-cuts by hollow grouting anchor cables. Background technique [0002] Coal seam groups in close distances generally adopt the mining method of multi-coal seam joint arrangement, and prepare roadways on the coal seam floor. In order to increase the continuous advancing length of the working face and reduce the number of relocations, many mining areas adopt cross-roadway mining, which causes severe deformation of the crossed roadway during mining. Even damage and instability. With the continuous increase of my country's demand for coal and the increasingly complex mining conditions, multiple cross mining roadways have almost become an unavoidable technical problem, and its proportion will further increase. [0003] At present, the met...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D21/00
Inventor 李桂臣马振乾王朋朋张农韩昌良卫英豪薛俊华阚甲广
Owner CHINA UNIV OF MINING & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products