[0015] Carry out the plantation of bispinus paspalum of the present invention in Guangdong Fankou lead-zinc mine tailings pond, carry out according to the following steps:
[0016] (1) Surface treatment of tailings: In March, the surface layer of the tailings was plowed at a depth of 15 cm. After measuring its acidity, pH=1, so the amount of borax applied to the tailings was 5 kg per square meter when plowing. Mine surface, and mix borax and tailings evenly by plowing, then place the plowed tailings for 3 days, and then level the tailings surface;
[0017] (2) Sowing: Open a ditch with a depth of 5 cm on the surface of the leveled tailings, with a row spacing of 30 cm, sprinkle the paspalum seeds in the ditch, fill it with tailings sand, and pour a sufficient amount of water;
[0018] (3) Daily management of paspalum biscarpa: water every 5 days from sowing paspalum biscarina seedlings to seedlings unearthed, usually about 20 days after seedlings emerge, and water once paspalu...
Embodiment 2
[0023] Carry out the plantation of bispinus paspalum of the present invention in Guangdong Fankou lead-zinc mine tailings pond, carry out according to the following steps:
[0024] (1) Surface treatment of tailings: In March, the surface layer of tailings was plowed at a depth of 15 cm. After measuring its acidity, pH=2, so borax was applied to the tailings according to the amount of 3 kg per square meter when plowing. Mine surface, and mix borax and tailings evenly by plowing, then place the plowed tailings for 3 days, and then level the tailings surface;
[0025] (2) Sowing: Open a ditch with a depth of 5 cm on the surface of the leveled tailings, with a row spacing of 30 cm, sprinkle the paspalum seeds in the ditch, fill it with tailings sand, and pour a sufficient amount of water;
[0026] (3) Daily management of paspalum biscarpa: water every 5 days from sowing paspalum biscarina to seedling unearthed, and the seedlings usually emerge in about 20 days. human intervention...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com