A technology for bonnets and parts, applied in valve devices, metal processing equipment, etc., can solve problems such as difficult to meet standard requirements, unreliable product performance, low material utilization rate, etc., achieve high production efficiency, save machining troubles, The effect of smooth product flow
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A method for forging valve cover parts, the working process of which is:
[0033] 1. Selection of blank: the diameter of the blank is Ф60mm;
[0034] 2. Heating: Medium frequency induction electric heating is adopted, the heating time is 24S, and the blank heating temperature is controlled at 1150°C;
[0035] 3. Billet making: Use a 750Kg air hammer at 1150°C to make a billet using a billet mold;
[0036] 4. Pre-forging: Pre-forging with a 1600t press at 1150°C using a pre-forging die;
[0037] 5. Final forging: Use a 1600t press at 1000°C to use a final forging die for final forging;
[0038] 6. Trimming: Trimming with J31-315 press at 800°C using a trimming mold;
[0039] 7. Punching: Use a J31-315 press at 800°C to punch with a punching die;
[0040] 8. Calibration: Calibrate with a 300t press at 800°C using a calibration mold;
[0041] 10. Heat treatment;
[0042] 11. Sanding: use shot blasting machine to sand;
[0043] 12. The finished product is obtained th...
Embodiment 2
[0045] A method for forging valve cover parts, the working process of which is:
[0046] 1. Selection of blank: the diameter of the blank is Ф60mm.
[0047] 2. Heating: medium frequency induction electric heating is adopted, the heating time is 24S, and the blank heating temperature is controlled at 1100°C;
[0048] 3. Billet making: Use a 750Kg air hammer to make billets at 1100°C using a billet mold;
[0049] 4. Pre-forging: Pre-forging with a 1600t press at 1100°C using a pre-forging die;
[0050] 5. Final forging: Use a 1600t press at 1050°C to use a final forging die for final forging;
[0051] 6. Trimming: Trimming with J31-315 press at 850°C using a trimming mold;
[0052] 7. Punching: Use a J31-315 press at 850°C to punch with a punching die;
[0053] 8. Calibration: Calibrate with a 300t press at 850°C using a calibration mold;
[0054] 10. Heat treatment;
[0055] 11. Sanding: use shot blasting machine to sand;
[0056] 12. The finished product is obtained...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com