Preparation method of floor plate
A manufacturing method and floor slab technology, applied in the field of floor slab production, can solve problems such as unsatisfactory installation, and achieve the effects of uniform force, good anti-seismic performance and durability, and high tensile and flexural strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] The manufacture method of floor plate, it comprises following specific manufacture steps:
[0023] (1) Make three-dimensional truss-type steel grid: ① Make mesh, put cold-drawn galvanized steel bars and cold-drawn galvanized steel wires on the CNC welding machine according to the design requirements, and then use the CNC welding machine to cold vertically and horizontally Drawing galvanized steel bars and cold-drawn galvanized steel wire cross intersections are welded to form a mesh. The formed mesh bars are divided into two types: main bars 2 and auxiliary bars 5. Main bars 2 are cold-drawn galvanized bars, and auxiliary bars 5 are cold-drawn bars. The galvanized steel wire is drawn, and there are three auxiliary bars 5 between the two main bars 2 in the longitudinal and horizontal directions. The main reinforcement 2 and the auxiliary reinforcement 5 should protrude from the periphery of the mesh, and the protruding part is the anchoring reinforcement 1 protruding fro...
Embodiment 2
[0030] The difference from Example 1 is that when making a three-dimensional truss-type steel mesh frame, the manufacturing process of forming a steel mesh frame is that between the two-layer mesh sheets, it is only necessary to put the corresponding mesh on the upper and lower layers in the short direction. The main reinforcement 2 of the sheet is supported by X-type short galvanized steel bar scissors 6 and the galvanized steel column 3, and the main reinforcement 2 of the second-layer mesh is stretched and welded to form a three-dimensional truss-type galvanized steel grid frame. The distance between the center of the column 3 and the center of the intersection point of the mesh sheet is not more than 12mm.
[0031] This method is applicable to the production of floor slabs with a width not greater than 2800mm and a length not greater than 6000mm.
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com