Distributed centralized scheduling upgrading method and system for network element software version
A software version and centralized scheduling technology, applied in the field of communication, can solve the problem of low upgrade efficiency and achieve the effect of easy code implementation, increased hardware investment, and simple software architecture
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0051] In order to solve the problem of low upgrade efficiency when a large number of network element software upgrades are performed in the prior art, the present invention provides a method and system for distributed centralized scheduling and upgrade of network element software versions. The core idea of the method is: the network management server first The specified list of NEs to be upgraded and the network topology (including the link bandwidth) decide...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com