Ecological restoration method of hydro-fluctuation belt
A restoration method and ecological restoration technology, applied in botany equipment and methods, horticulture, coastline protection, etc., to achieve the effect of improving efficiency, great social and environmental benefits, and broad application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] 5) Install bermudagrass concrete lawn: Install bermudagrass concrete lawn in the lattice frame backfilled with planting matrix, and use cement mortar above M10 to joint;
[0031] 6) Maintenance: After installation, the slope of the water-fluctuation zone of the vegetation concrete shall be watered, fertilized, weeded, and pest control and management shall be carried out daily to promote the rapid recovery of the slope landscape; When it falls back, it is necessary to closely observe the regreening situation, water and maintain it in time, and remove the inflorescence in time to promote the vegetative growth of the stem.
[0032] Example 2
[0033] 1) Prefabrication of concrete modules capable of planting bermudagrass: choose diabase aggregate with a particle size of 0.8-1.0cm, cement, inorganic mineral powder, water reducing agent, and water according to the weight ratio of 1600:260:30:3.5:68 and mix It is made by pouring. The raw materials are washed or sieved before ...
Embodiment 2
[0037] 5) Install bermudagrass concrete lawn: Install bermudagrass concrete lawn in the lattice frame backfilled with planting matrix, and use cement mortar above M10 to joint;
[0038] 6) Maintenance: After installation, the slope of the water-fluctuation zone of the vegetation concrete shall be watered, fertilized, weeded, and pest control and management shall be carried out daily to promote the rapid recovery of the slope landscape; When it falls back, it is necessary to closely observe the regreening situation, water and maintain it in time, and remove the inflorescence in time to promote the vegetative growth of the stem.
[0039] Example 3
[0040] This example is to sow bermudagrass on site in the water-fluctuation zone, which requires a long construction time, and it is necessary to choose an appropriate time to ensure that the restoration project will not be affected by the water level.
[0041] 1) Prefabricated concrete modules capable of planting bermudagrass: sele...
Embodiment 3
[0044] 4) Install the concrete module: install the concrete module in the lattice frame backfilled with the planting matrix, and point the joints with cement mortar above M10;
[0045] 5) Plant bermudagrass lawns on concrete modules: when the average temperature is above 18°C, sow bermudagrass seeds on the concrete on the side slope of the water-fluctuation zone. No substrate is required for sowing; cover non-woven fabrics after sowing (reveal after germination) open), watering and maintenance every day, spraying foliar fertilizer once a week (0.1wt% compound fertilizer or urea), 40-50 days after lawn can be formed; about 20 days after germination, sprinkle crushed cake fertilizer before the lawn becomes lawn to promote growth Ping.
[0046] 6) Maintenance: Daily watering, fertilization, weeding, and pest control and management shall be carried out on the slope of the water-fluctuating zone after sowing, so as to promote the rapid restoration of the slope landscape; When it f...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Length and width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com