Construction method of large-area concrete terrace
A construction method and large-area technology, applied to pavement details, roads, roads, etc., can solve problems such as heavy workload, labor consumption, and easy to cause omissions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] Such as figure 1 Shown, the present invention adopts block construction method.
[0009] During the construction of the previous small floor 1, the sleeve pipe 2 is embedded laterally on the outer periphery, so that the opening of the sleeve pipe 2 faces outward.
[0010] After the previous small floor 1 is poured and formed, a straight steel rod 3 is inserted into the casing 2, and the outer end of the rod 3 protruding from the opening of the casing 2 is connected to the bottom of the next small floor 4. Steel bar 5 is fixedly connected.
[0011] After the last small floor 4 is poured and formed, the bar 3 is cut from the joint between the two small floors 1 and 4.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com