Method for realizing configuration of main and auxiliary board cards as well as board cards
An implementation method and board technology, applied in the field of communication, can solve the problems of unguaranteed performance of the master control node, unreasonable selection mechanism of the master control node, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0047] Preferably, the alternative boards should include all the main control boards and backup boards in normal operation of multiple chassis, or only a part of them, but it should be ensured that the alternative boards have the ability to control other boards in the chassis. The function or ability to exercise control.
[0048] And, the above-mentioned hardware information includes the physical location information of the board (for example, the frame identification of the board where the board is located, the position identification of the board in the frame, the address information of the board), the primary and backup status of the board in the frame where the board is located. Status information, wherein the active and standby status information is used to indicate that the board is the main control board or the standby control board in the chassis where it is located.
[0049] Because the competition message sent by the board card may be lost, and, based on the competit...
example 2
[0067] In this example, the determination of the standby control node, the determination of the main service node, the determination of the standby service node, and the monitoring of the main control node can refer to the description of the previous example. The difference between this example and Example 1 is that When determining the master control node, if a board card fails in a competition, the board card will record the candidate board card that won the competition, and continue to send the competition message. When the number of times reaches the predetermined number of times, other candidate boards that compete to win the board among all the candidate boards are counted, and according to the statistics of each board, all the candidate boards can be ranked. At this time, you can Select one of the top candidate boards to determine the main control node, and the selection process can be random selection.
[0068] On the basis of this example, the setting of the competiti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com