United method for tunneling super-strong or strong rock burst hole section of TBM construction tunnel
A tunnel and rockburst technology, which is applied in the field of tunnel excavation and support, can solve the problems of being unable to deal with extremely strong or strong rockburst limitations, achieve strong economic and social benefits, ensure tunneling speed, and ensure safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] The diameter of the designed excavation section of the TBM construction tunnel in this embodiment is 10m, and the diameter of the design excavation section of the TBM construction tunnel is greater than 10m, which is to comprehensively consider the size of the excavation section of the upper pilot tunnel and the size of the construction machinery in the drilling and blasting excavation. Factors, for TBM construction tunnels with diameters less than 10m, only the full-face drilling and blasting method can be selected to deal with extremely strong or strong rockbursts.
[0023] Its joint tunneling method includes the following steps:
[0024] ①The design of the tunnel excavation section for TBM construction. The excavation section is divided into two parts, the upper part is the upper pilot tunnel, and the lower part is the TBM excavation section. The relative positional relationship between the two is as follows: figure 1 shown.
[0025] ②The design of the excavation se...
Embodiment 2
[0029] The diameter of the designed excavation section of the TBM construction tunnel in this embodiment is 10m, and the diameter of the design excavation section of the TBM construction tunnel is greater than 10m, which is to comprehensively consider the size of the excavation section of the upper pilot tunnel and the size of the construction machinery in the drilling and blasting excavation. Factors, for TBM construction tunnels with diameters less than 10m, only the full-face drilling and blasting method can be selected to deal with extremely strong or strong rockbursts.
[0030] Its joint tunneling method includes the following steps:
[0031]①The design of the tunnel excavation section for TBM construction. The excavation section is divided into two parts, the upper part is the upper pilot tunnel, and the lower part is the TBM excavation section. The relative positional relationship between the two is as follows: Figure 5 shown.
[0032] ②The design of the excavation se...
PUM
Property | Measurement | Unit |
---|---|---|
Layer thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com