Tunneling operation simple emergent life-saving connection device and mounting method thereof
An installation method and tunnel technology, which can be used in safety devices, mining devices, ventilation of mines/tunnels, etc., can solve problems such as time-consuming and difficult to grasp the location
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Embodiment 1: as figure 1 , 2 , 3, 4, 5, and 6, in the figure, 1—tunnel excavation operation face; 2—rubber air pipe; 3—steel pipe; 4—collapsed body; Rubber air duct, 8—telephone line, 9—transition joint, 10—flange, 11—bolt, 12—tool knife, 13—emergency toolbox, 14—hand pliers, 15—telephone and wiring, 16—sandbag , 17—insulating tape, 18—screwdriver, 19—wrench, 20—axe, 21—flashlight.
[0043] A rubber air pipe 2 is paved near the tunnel excavation operation face 1 at the same time when the tunnel or roadway is excavated. Installation position of the rubber air duct 2: in order to prevent the operation vehicle from being crushed, it is placed in the left or right lower corner of the tunnel excavation operation surface 1 or the roadway operation section. In order to increase the compressive strength of the rubber air duct 2, a steel pipe 3 can be added outside the rubber air duct 2. The two ends of the rubber air duct 2 are equipped with an emergency tool box 6 .
[0...
Embodiment 2
[0051] A method for installing a simple emergency lifesaving contact device for tunnel operations, comprising the following steps:
[0052] Lay a tunnel rubber air duct near the working surface during tunnel or roadway excavation;
[0053] Installation position: placed in the left or right lower corner of the tunnel or roadway operation section, and covered with shallow soil;
[0054] Coat the steel pipe outside the tunnel rubber air duct;
[0055] Put a telephone line inside the rubber duct, and make a clear mark. The telephone line is 2-3 meters longer than both ends of the rubber duct, and the length of each meter is marked on the outside of the rubber duct; the length of the rubber duct is not less than The distance between the two linings;
[0056] The rubber air duct is dragged forward along with the palm;
[0057] The steel pipe is a section of 1-2 meters, and the two sections of steel pipe are connected by flanges, and the two butt flanges are sandwiched by a 5-15cm...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com