Unballasted track bed plate construction method
A ballastless track and construction method technology, which is applied to tracks, track laying, track maintenance, etc., can solve problems such as high construction accuracy requirements, large technical management span, and difficulty in forming the base plate of large and super-high sections.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0126] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0127] As shown in Figure 1, the construction method of the ballastless track base plate includes the following steps:
[0128] a01. Bridge deck acceptance and pre-planning evaluation;
[0129] a02. Measure the wiring of the stakeout base plate;
[0130] a03. Arrange the fixed bolt connection;
[0131] a. Lay a sliding layer of two cloths and one film on the bridge deck;
[0132] b. Lay a hard plastic foam layer at both ends of the beam joint;
[0133] c. After installing the post-cast connector;
[0134] d0. Install alveolar shear studs;
[0135] d. Install the reinforcement of the base plate;
[0136] e. Install the base plate template;
[0137] f. pouring base plate concrete;
[0138] g. After the construction of the pouring belt and the shear tooth groove, the connection of the base plate is completed.
[0139] The specific measure...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com