System and method of chamber destruction of bomb
A technology of chambers and bombs, which is applied in the field of bomb destruction systems in chambers, can solve the problems of high security intensity, workload of warning, and difficulty in finding bomb sites, so as to prevent flying out of the chamber, resist long-term weathering, and ensure safety. improved effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Figure 1-4 The shown chamber destruction bomb system is an embodiment of the present invention, consisting of a destruction chamber 9, two adit 11 and two connection lanes 10, and the destruction chamber 10 is located in the surrounding rock 6 The underground space in the middle, it is located between the two arks 11 and on the same side as the two adits 11, and is connected with the adit 11 through the connection alley 10; Adopt naked alleyways. The destruction chamber 9 is set in hard granite with a compressive strength of 150Mpa, making it suitable for destroying bombs with an explosive equivalent of 200kg or less; the distance from the destruction chamber 9 to the ground surface is 16m, and its volume is 85m 3 , with a span of 7.0m; the bottom plate 3 of the destruction chamber 9 is covered with a sand cushion 2 with a height of 1m, and the bomb and the detonating charge package 1 are placed on it; the roadway formed by each of the connecting lanes 10 and 11 has ...
Embodiment 2
[0037] Such as Figure 5 Shown chamber destruction bomb system is the second embodiment of the present invention, and it is different from Embodiment 1 by destroying chamber 9, a pit 11 and a connection lane 10, and destroying chamber 9 and pit 11 is on the same side. The distance from the said destruction chamber 9 to the surface is 15m, and its volume is 90m 3 , span 8.0m; the bottom plate 3 of the destruction chamber 9 is covered with a sand cushion 2 with a height of 1.5m, the length of the connecting lane 10 is 10m, the length of the adit 11 is 30m, and the space in the aisle and the lane is 190m 3 , set up an explosion-proof retaining wall 12 at a distance of 3m from the entrance of the chamber.
Embodiment 3
[0039] Such as Image 6 Shown chamber destruction bomb system is the third embodiment of the present invention, and it is different from Embodiment 1 and is made of destruction chamber 9, a pit 11 and a connection lane 10, and destruction chamber 9 is positioned at flat Cave 11 is on the opposite side. The distance from the said destruction chamber 9 to the surface is 20m, and its volume is 100m 3 , span 10m; the bottom plate 3 of the destruction chamber 9 is covered with a sand cushion 2 with a height of 2m, the length of the connecting road 10 is 35m, the length of the avenue 11 is 40m, and the space in the cave and the road is 200m 3 , Set up an explosion-proof retaining wall 12 at a distance of 4m from the entrance of the chamber.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com