Method applied to project construction site

A construction site and project technology, which is applied in the fields of earthwork drilling, construction material processing, shaft equipment, etc., can solve the problems of identifying on-site hazard sources and the inability to achieve refined management on the construction site, so as to reduce the probability of on-site accidents, Manageable Effects

Pending Publication Date: 2022-07-29
湖北鑫楚苏昂建筑工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the traditional construction site management and control system is difficult to effectively and timely identify on-site hazards, and the construction site cannot achieve fine management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0128] A method applied to the construction site of a project, comprising:

[0129] S1: excavation step, the steps are:

[0130] 1) After the excavation trolley is in place, eliminate risks to ensure safe construction;

[0131] 2), according to the footage, control the amount of explosives, according to the surrounding rock conditions, plan the blast hole spacing 40-50cm;

[0132] 3), ①The flexible air duct must be on the wall, the height of the feng shui pipe should be more than 1 meter higher than the arch foot, and the height should be uniform.

[0133] ②The excavation footage shall be informed by the on-duty personnel and the tunnel leader after consultation, and the drilling depth shall not exceed 30 cm;

[0134] ③ Excess and under excavation should be controlled within 15 cm;

[0135] ④For explosive blasting, a special person must be assigned to be responsible for vigilance.

[0136] ⑤The placement of the feng shui pipes on the air gun is neat and tidy;

[0137] ⑥ T...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of building construction planning, in particular to a method applied to a project construction site, and the method comprises the steps of S1, excavation, S2, support installation, S3, guniting, S4, inverted arch construction, S5, waterproof material construction, S6, steel bar binding, S7, embedded part fixing, S8, trolley pushing, S9, cement stirring and S10, machining, and the safety and quality of the project construction site can be finely controlled. The on-site inspection module can reduce the occurrence probability of on-site accidents. According to the invention, the implementation progress of the project can be tracked in real time, the construction condition is known, and transparent management and control of the project construction site are realized. According to the invention, the collected construction site data is analyzed in real time, so that the site construction condition can be clearly reflected, and the management of the construction site is facilitated.

Description

technical field [0001] The invention relates to the technical field of building construction planning, in particular to a method applied to a project construction site. Background technique [0002] With the continuous improvement of people's living standards, the demand for life safety and product quality is getting higher and higher, but safety accidents occur every day, and the number of casualties is shocking. There are a large number of high-altitude operations, limited space operations, electricity-related operations and road traffic operations on the construction site, and there are many sources of danger. . How to effectively and timely identify the source of on-site danger, avoid the occurrence of danger, and how to manage and control the construction site safely and effectively are the current focus of construction enterprises. [0003] At present, it is difficult for the traditional construction site management and control system to effectively and timely identi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/10E21D11/18E21D11/15E21D11/10E21D11/38E21F16/00E21F5/00E04G21/02E04G21/06
CPCE21D9/10E21D11/18E21D11/152E21D11/105E21D11/38E21F16/00E21F5/00E04G21/02E04G21/06
Inventor 薛金力
Owner 湖北鑫楚苏昂建筑工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products