Management and control method applied to project delivery construction site
A technology for construction sites and projects, applied in the field of computer communication, can solve the problems of inability to achieve refined management on the construction site, identify on-site danger sources, etc., to reduce the probability of occurrence, solve the cost of paper, and facilitate management.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The invention will be described in further detail below in conjunction with the accompanying drawings.
[0040] Such as figure 1 As shown, the present invention provides an implementation method applied to the project delivery construction site management and control system, the method includes the following steps:
[0041] Step 1: Basic data into the system. First of all, the existing project, contract, supplier and personnel data need to be entered into the system.
[0042] Step 1-1: Data requirements: All project, contract, supplier and personnel data are divided into construction areas and specialties.
[0043] Step 1-2: Personnel are divided into company administrators, project managers, work order managers, safety officers, quality officers, team leaders and team members.
[0044] Step 2: The project manager creates a new work order. There are three types of work orders: (1) Split work orders based on existing projects; (2) Split work orders based on existing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com