Three-dimensional grid monitoring method based on BIM technology
A three-dimensional grid and technical technology, applied in the direction of instruments, data processing applications, design optimization/simulation, etc., can solve problems such as impact, achieve simple operation, ensure safety, and improve monitoring accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0012] This embodiment provides a three-dimensional grid monitoring method based on BIM technology. This method monitors the settlement displacement of the measurement point by setting an infrared transmitter, and the data receiver performs data reception and processing linkage with the BIM model for data analysis. The three-dimensional model realizes Three-dimensional monitoring point presentation.
[0013] Specific steps are as follows:
[0014] Step 1: Establish a 3D model of the project and import it into the smart construction site monitoring module, using the 3D model as the presentation body of later monitoring data;
[0015] Step 2: Divide the grid of the project according to the horizontal and vertical, and divide the grid monitoring points according to the monitoring accuracy requirements, then measure the measurement data of each grid point and enter the infrared data transmitter, and then install the transmitter on the measurement point. The transmitter is used as...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com