Temporary building model establishing method based on three-dimensional GIS and BIM integration, and application thereof

A model building and three-dimensional integration technology, applied in 3D modeling, data processing applications, special data processing applications, etc., can solve problems such as complex construction sites, limited construction space, and increased construction difficulty of the main project, so as to improve refined management degree, improve the authenticity and accuracy, facilitate the drafting and adjustment of the effect

Pending Publication Date: 2022-02-22
CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In large-scale building construction, there are often problems such as complex construction sites, long construction lines, inconvenient RTK data collection, and difficult re-survey of design lines. Especially when there are a large number of temporary construction facilities in the construction site, due to the limited construction space available, Simply relying on the existing construction drawings and construction experience will easily lead to problems such as unreasonable temporary construction scheme design, increase the construction difficulty of the main project, affect the construction progress and construction quality of the main project, and greatly increase the construction cost
However, the application object of BIM technology is often a single building, and it cannot be used to simulate temporary construction projects and optimize temporary construction schemes under the complex surrounding environment of the project.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary building model establishing method based on three-dimensional GIS and BIM integration, and application thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0026] It should be noted that the experimental methods described in the following embodiments, unless otherwise specified, are conventional methods, and the reagents and materials, if not otherwise specified, can be obtained from commercial sources; in the description of the present invention, The terms "landscape", "portrait", "top", "bottom", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", The orientation or positional relationship indicated by "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have Certain orientations, co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a temporary building model establishing method based on three-dimensional GIS and BIM integration. The method comprises the following steps: establishing a BIM model; collecting three-dimensional GIS information; converting the three-dimensional GIS information by adopting a classification conversion method, and importing the three-dimensional GIS information into a BIM platform; integrating BIM model data and the converted three-dimensional GIS information, and establishing a three-dimensional integrated temporary building model on the basis of the BIM model data and the converted three-dimensional GIS information; using a BIM5D platform, importing various construction information into the BIM5D platform, simulating a construction process in combination with the three-dimensional integrated temporary building model, and establishing a 5D temporary building model based on the construction progress and a construction cost. According to the invention, three-dimensional GIS information is converted and then integrated with a BIM model, a three-dimensional integrated temporary building model based on the BIM platform is obtained, a construction process is subjected to 5D simulation in combination with construction information, and a construction scheme is dynamically adjusted according to a simulation result, so that the management capability of long-line and large-scale regional engineering is improved.

Description

technical field [0001] The present invention relates to fields. More specifically, the present invention relates to a temporary construction model establishment method and application based on the integration of 3D GIS and BIM. Background technique [0002] BIM technology has been widely used in existing engineering construction. With the continuous development of national infrastructure level, new requirements are put forward for construction efficiency and process quality control. In large-scale building construction, there are often problems such as complex construction sites, long construction lines, inconvenient RTK data collection, and difficult re-survey of design lines. Especially when there are a large number of temporary construction facilities in the construction site, due to the limited construction space available, Simply relying on the existing construction drawings and construction experience will easily lead to problems such as unreasonable temporary constru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06Q50/08G06T17/05G06T17/10
CPCG06F30/13G06T17/05G06T17/10G06Q50/08G06T2210/04
Inventor 郭冬冬邢浩李瀚陆鑫徐长友吴佳琪张明亮孙浩铭唐亚辉盛帅兵温建宇黄金伟张辉文李峰
Owner CHINA RAILWAY SEVENTH GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products