Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Rail transit construction scheduling management system and method based on drawing board analysis and medium

A dispatching management and rail transit technology, applied in the field of rail transit construction dispatching management system based on drawing board analysis, can solve the problem that the operation area and power supply partition do not have automatic error-checking and error-correcting functions, etc., so as to improve the filling efficiency and reduce the effect of error

Pending Publication Date: 2022-01-14
SHANGHAI BAOSIGHT SOFTWARE CO LTD
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction scheduling management of rail transit, it is necessary to fill in the construction plan. The traditional way of filling in the construction plan is mainly based on excel summary. For the operation area and power supply partition filled in text, there is no automatic error correction and error correction function. Therefore, it is necessary to improve the construction plan. Standardization and accuracy, reducing the safety risks caused by artificially filling in the construction plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rail transit construction scheduling management system and method based on drawing board analysis and medium
  • Rail transit construction scheduling management system and method based on drawing board analysis and medium
  • Rail transit construction scheduling management system and method based on drawing board analysis and medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] In the present invention, the intelligent drawing board analysis method is applied to the construction scheduling management system in the rail transit field, such as figure 1 As shown, it includes a board parameter configuration module, a board analysis module, an area attribute configuration, a construction area board selection module, a power supply area board selection module, a conflict detection board, and a construction monitoring board module. The present invention introduces the intelligent drawing board function into the construction scheduling management system, extracts the rail transit construction area involved in the construction as an optional graphic element, and extracts drawing elements of the drawing board as predefined parameters, and calls the drawing board analysis and drawing module algorithm , automatically renders the visual rendering of the track area of ​​the rail transit line as a map.

[0037] In the board parameter configuration, pre-defin...

Embodiment 2

[0056] Embodiment 2 can be regarded as a preferred example of Embodiment 1. The method of rail transit construction scheduling management based on drawing board analysis described in embodiment 2 utilizes the rail transit construction scheduling management system based on drawing board analysis described in embodiment 1.

[0057] The invention can realize standardized selection of construction areas in construction scheduling. Due to the binding between graphic elements and metadata, the risk of filling in the construction area is greatly reduced, the accuracy and standardization of the construction plan area are improved, and the automatic introduction of the power supply area is realized through the association between the construction area and the power supply area. And it can be visually displayed on the drawing board for easy checking. In addition, the conflict detection board can visually display the areas where conflicts occur, and the real-time monitoring board ca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to the global variable; in drawing board analysis, according to service attribute data and the drawing board parameter, enabling a rail-mounted area and a power supply area to form a rectangular box, separately analyzing the line area data of the rail-mounted area and the power supply area, generating SVG graphs connected end to end, and displaying the SVG graphs on the drawing board; configuring the state attribute data of the rail-mounted area and the power supply area in attribute configuration; drawing construction plans in the drawing board, selecting a construction area and the power supply area according to the construction plans, generating area description according to a semantic analysis rule, displaying a conflict detection result among the construction plans on the drawing board, and monitoring the areas in real time. The functions of drawing, automatic analysis, selection and rendering of the rail-mounted area are achieved, and the method is more intuitive compared with table or character expression.

Description

technical field [0001] The invention relates to the technical field of rail transit construction dispatching, in particular to a rail transit construction dispatching management system, method and medium based on drawing board analysis. Background technique [0002] In the construction scheduling management of rail transit, it is necessary to fill in the construction plan. The traditional way of filling in the construction plan is mainly based on excel summary. For the operation area and power supply partition filled in text, there is no automatic error correction and error correction function. Therefore, it is necessary to improve the construction plan. Standardization and accuracy reduce the safety risks caused by artificially filling in construction plans. [0003] The prior art related to this application is the patent document CN109118054A, which discloses a subway operation construction scheduling management system, including data storage and reader, protection area se...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/30
CPCG06Q10/10G06Q10/06312G06Q50/40
Inventor 娄栋乾张明明吕子男郑力达张琴江浩群
Owner SHANGHAI BAOSIGHT SOFTWARE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products