A construction method and an integral technology, applied to the railway integral jacking frame interchange system and its construction field, can solve the problems of high interference in railway operation, unfavorable railway operation safety, long overhead period of the line, etc., and achieve short construction period, Good promotion use value, small investment effect

Active Publication Date: 2022-01-14
XIAN RAILWAY SURVEY & DESIGN INST CO LTD
View PDF12 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In this way of construction, the main body of the frame interchange and the retaining wall at the entrance and exit are two independent parts of the structure, which are constructed step by step. The length of the main structure is controlled according to the width of the railway shoulder. The overhead period of the line is long; during the construction of the splayed wall, it is necessary to carry out overhead protection for the railway subgrade, which has a large safety risk and is not conducive to the safety of railway operation; Completed under the overhead state of the railway, it will greatly interfere with the operation of the railway

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway integral type jacking frame interchange system and construction method thereof
  • Railway integral type jacking frame interchange system and construction method thereof
  • Railway integral type jacking frame interchange system and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the associated drawings. Preferred embodiments of the invention are shown in the accompanying drawings. However, the present invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0042] The present invention provides a railway integral type jacking frame interchange system and its construction method, the system includes a frame main body 12, such as figure 1 , the frame main body 12 has a rectangular cross-section, with reinforced concrete triangular sections 1 at the frame entrance and exit on both sides, and the frame main body 12 and the reinforced concrete triangular sections 1 at the frame entrance and exit on both sides form a t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a railway integral jacking frame interchange system and a construction method thereof. In the jacking construction of an underpass interchange, the two sides of a construction frame interchange need to be constructed with an entrance and exit soil retaining splayed wall which is of an independent two-part structure, the step-by-step construction period is long, and the interference to the operation of a railway is large. The system comprises a frame body, the cross section of the frame body is rectangular, the two sides of the frame body are frame entrance and exit reinforced concrete triangular sections, a triangular steel shed frame is arranged on an inclined face, a beam top steel plate is arranged at the top of the triangular steel shed frame, and the beam top steel plate and the top of the frame body form the same sliding face. The entrance and exit reinforced concrete triangular section and the frame structure are integrally prefabricated, the stress performance is good, secondary pouring of an entrance and exit splayed wall is avoided, the frame entrance and exit reinforced concrete triangular section and the frame structure are jacked in place at a time, the construction period is short, safety is high, and good application and popularization value is achieved.

Description

technical field [0001] The invention relates to the technical field of railway jacking frame overpass construction, in particular to a railway integral jacking frame overpass system and a construction method thereof. Background technique [0002] Jacking construction is a common construction method for underpassing interchanges. Traditional railway jacking frame interchanges generally prefabricate a rectangular frame in the work pit on one side of the railway. Under the condition of removing the overhead railway line, construct the retaining walls on both sides of the frame interchange. After the prefabrication of the eight-shaped wall is completed, remove the overhead system of the railway line and resume the operation of the railway line. The entire jacking frame interchange project is completed. [0003] In this way of construction, the main body of the frame interchange and the retaining wall at the entrance and exit are two independent parts of the structure, which are ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01B2/00E01C3/00E02D17/20
CPCE01B2/00E01B2/006E01C3/00E01C3/006E02D17/20E01B2204/08Y02A30/60
Inventor 孙杰郭荣科吴永峰侯广伟林国强田波
Owner XIAN RAILWAY SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products