Process for constructing prefabricated small box girder bridge by half-range construction firstly and then whole construction

A construction technology and bridge construction technology, applied in the direction of bridges, bridge construction, bridge parts, etc., can solve the problems of unable to interrupt traffic, bad social impact, unable to change the bridge position, etc., to facilitate production and life needs, reduce social impact, construction Reasonable effect of craftsmanship

Pending Publication Date: 2021-07-16
甘肃省交通规划勘察设计院股份有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The river crossed by the existing bridge is a first-class tributary of the Yellow River. The bridge is located 15km upstream and 9.8km downstream. If the traffic is interrupted during construction, residents on both sides of the strait will have to detour for a long distance, which is very inconvenient and social. bad influence
At the same time, this bridge is a demolition and reconstruction bridge construction on the existing road. The inability to interrupt the traffic, the inability to set up sidewalks in the river and the inability to change the bridge position have become the three major problems to be solved in the construction of the bridge.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Process for constructing prefabricated small box girder bridge by half-range construction firstly and then whole construction
  • Process for constructing prefabricated small box girder bridge by half-range construction firstly and then whole construction
  • Process for constructing prefabricated small box girder bridge by half-range construction firstly and then whole construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0031] It should be noted that, in the description of the present invention, unless otherwise specified, the meaning of "plurality" is two or more; the terms "upper", "lower", "left", "right", "inner ", "outside", "front end", "rear end", "head", "tail", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and Simplified descriptions, rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and thus should not be co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a process for constructing a prefabricated small box girder bridge by half-range construction firstly and then whole construction. The process comprises the step of right half-range bridge construction including a pile foundation 1A, a pier 2A and a pier cover beam 3A; the pier 1A is located above the pile foundation 2A, a pier 1B is located above a pile foundation 2B, a pier cover beam 3B is located above the pile foundation 2B, and the pier cover beam 3B is located above the pile foundation 2B; and an upper main beam 4A is positioned above the pier cover beam 3A. The construction process method is reasonable, left and right half-range construction is conducted, then the left and right half-range construction is connected into a whole, the old bridge is used for keeping pass, a shortcut and a temporary bridge are prevented from being arranged in a riverway, economic investment is saved, and social influence is reduced, namely,without demolishing the old bridge, the old bridge plays the dual role of guaranteeing traffic and temporary access. After the old bridge is dismantled, a half-range bridge is constructed firstly to replace the old bridge to play a role of traffic keeping and a temporary access, the traffic keeping requirement is greatly met, the production and living requirements of residents on the two banks are met, the construction process is more reasonable, and therefore the problems and defects provided by the invention are effectively solved and overcome.

Description

technical field [0001] The invention relates to the technical field of bridge construction, and more specifically relates to a prefabricated small box girder bridge construction technology which is half first and then complete. Background technique [0002] During the construction of traditional bridges, temporary construction access roads (convenience bridges) or temporary access roads (convenience bridges) are usually erected, especially for bridge renovation projects on existing lines, and temporary access roads (convenience bridges) are built for the convenience of people traveling. For example, during the construction of a bridge across a river, for the construction site where the water depth is shallow, a drainage pipe is buried to build a construction access road; for a deep water depth, a steel trestle bridge is erected as a construction access bridge. [0003] The two ends of the existing cross-river bridge connect tourist attractions and the city center, and there ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D2/04E01D19/02E02D27/12
CPCE01D21/00E01D2/04E01D19/02E02D27/12
Inventor 张己存唐学军曾志刚杨志雄赵永春
Owner 甘肃省交通规划勘察设计院股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products