Intermittent opening gas well shut-in time determination method and system

A technology for determining method and time relationship, applied in wellbore/well components, production fluids, earthwork drilling, etc., can solve the problems of long test method cycle, restriction, rationality evaluation, etc., to improve well opening rate and production Effect

Active Publication Date: 2021-06-29
PETROCHINA CO LTD
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the methods for determining the working time of interspersed gas wells mainly include test method and simulation method. The test method has a long cycle and the single well is scattered, which affects the productivity of interspersed gas wells. The single well mechanism model of the simulation method is difficult to truly describe the actual reservoir. The research results are difficult to be consistent with the actual situation, and it is difficult to guarantee the productivity of the intermittent gas well during the application process; both of these two methods have certain limitations, and there are certain restrictions on the productivity of the intermittent gas well.
At present, each gas production unit in the Changqing gas region has different positions for inter-split gas wells, resulting in large differences in the optimization of inter-split gas wells. Most of the systems adopted the empirical method, and did not evaluate its rationality, which also has a certain impact on the productivity of intersecting gas wells

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intermittent opening gas well shut-in time determination method and system
  • Intermittent opening gas well shut-in time determination method and system
  • Intermittent opening gas well shut-in time determination method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0025] Those skilled in the art know that the embodiments of the present invention can be implemented as a system, device, device, method or computer program product. Therefore, the present disclosure may be embodied in the form of complete hardware, complete software (including firmware, resident software, microcode, etc.), or a combination of hardware and software.

[0026] In view of the fact that the shut-in time of intermittent gas wells determined in the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an intermittent opening gas well shut-in time determining method. The intermittent opening gas well shut-in time determining method comprises: generating a casing pressure recovery coefficient of a current intermittent gas well according to current intermittent gas well parameters obtained in advance; and determining the optimal well shut-in time of the current intermittent gas well according to the casing pressure recovery coefficient of the current intermittent gas well, the casing pressure of the current intermittent gas well and the optimal well shut-in time standard chart corresponding to the type of the current intermittent gas well. The productivity of the intermittent gas well can be further fully exerted, and the well opening time rate and yield of the intermittent gas well are improved.

Description

technical field [0001] The invention relates to the technical field of gas reservoir engineering, in particular to a method and system for determining the shut-in time of an intermittent gas well. Background technique [0002] Tight sandstone gas reservoirs play a pivotal role in natural gas reserves and are one of the important resources for the rapid development of natural gas. The Sulige gas field is a typical tight sandstone gas reservoir with tight reservoirs and strong heterogeneity. With the deepening of development, the number of gas wells has increased year by year, and the proportion of low-yield gas wells has exceeded 60% and the proportion has increased year by year. The vast majority of low-yield gas wells adopt intermittent production because they cannot produce continuously. A reasonable splitting system can increase the operating time rate of splitting gas wells and give full play to the productivity of gas wells. At present, the methods for determining the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/20G06Q10/04G06Q50/02E21B43/00G06F111/10G06F119/14
CPCG06Q10/04G06Q50/02E21B43/00
Inventor 刘莉莉兰义飞安红燕刘浩杨辉王龙刘会会刘鹏程吴优
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products