Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Rapid cooling method for tower drum

A rapid cooling and tower technology, which is applied in the monitoring of wind turbines, wind power generation, wind turbines, etc., can solve the problems of lowering the temperature, unable to monitor the temperature of the tower, and unable to dissipate heat from the tower, so as to achieve the goal of improving efficiency and speed Effect

Pending Publication Date: 2021-06-25
景能科技有限公司
View PDF1 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above cut-off valve has the advantage of using the cold air entering the tower to dissipate heat from the corresponding electrical components; however, the above-mentioned heat dissipation device still has some disadvantages, such as: the temperature in the tower cannot be monitored, The tower can not be cooled quickly and effectively, the temperature can be lowered, and the wind power generation can run quickly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rapid cooling method for tower drum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] A kind of rapid cooling method of tower tube, the rapid cooling method of tower tube comprises the following steps:

[0029] Step 1: Install temperature monitoring equipment, install the temperature monitoring equipment on the key parts of the tower, and monitor the temperature of the key parts of the tower through the temperature monitoring equipment;

[0030] Step 2: Set the monitoring value of the temperature monitoring equipment, set the monitoring fixed value in the temperature monitoring equipment, set it as the first fixed value and the second fixed value respectively, the second fixed value is higher than the first fixed value, and the temperature is higher than the first fixed value When the temperature is higher than the second fixed value, the alarm device sends out a gentle alarm signal, and when the temperature is higher than the second fixed value, the alarm device sends out a strong alarm signal;

[0031] Step 3: Transfer temperature monitoring informatio...

Embodiment 2

[0045] A kind of rapid cooling method of tower tube, the rapid cooling method of tower tube comprises the following steps:

[0046] Step 1: Install temperature monitoring equipment, install the temperature monitoring equipment on the key parts of the tower, and monitor the temperature of the key parts of the tower through the temperature monitoring equipment;

[0047] Step 2: Set the monitoring value of the temperature monitoring equipment, set the monitoring fixed value in the temperature monitoring equipment, set it as the first fixed value and the second fixed value respectively, the second fixed value is higher than the first fixed value, and the temperature is higher than the first fixed value When the temperature is higher than the second fixed value, the alarm device sends out a gentle alarm signal, and when the temperature is higher than the second fixed value, the alarm device sends out a strong alarm signal;

[0048] Step 3: Transfer temperature monitoring informatio...

Embodiment 3

[0061] A kind of rapid cooling method of tower tube, the rapid cooling method of tower tube comprises the following steps:

[0062] Step 1: Install temperature monitoring equipment, install the temperature monitoring equipment on the key parts of the tower, and monitor the temperature of the key parts of the tower through the temperature monitoring equipment;

[0063] Step 2: Set the monitoring value of the temperature monitoring equipment, set the monitoring fixed value in the temperature monitoring equipment, set it as the first fixed value and the second fixed value respectively, the second fixed value is higher than the first fixed value, and the temperature is higher than the first fixed value When the temperature is higher than the second fixed value, the alarm device sends out a gentle alarm signal, and when the temperature is higher than the second fixed value, the alarm device sends out a strong alarm signal;

[0064] Step 3: Transfer temperature monitoring informatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a rapid cooling method for a tower drum. The rapid cooling method comprises the following steps of: 1, installing temperature monitoring equipment, installing the temperature monitoring equipment at a key part of the tower drum, and monitoring the temperature of the key part of the tower drum through the temperature monitoring equipment; and 2, setting a monitoring value of the temperature monitoring equipment, and setting monitoring fixed values in the temperature monitoring equipment to be a first fixed value and a second fixed value respectively, wherein the second fixed value is higher than the first fixed value. When the temperature is higher than the first fixed value, a gentle alarm signal is sent out through an alarm device, the installed temperature monitoring equipment facilitates real-time monitoring of the temperature of the key part of the tower drum and facilitates monitoring of the temperature in the tower drum, the set first fixed value and the set second fixed value for monitoring facilitate monitoring through the alarm device, and when the fixed values are exceeded, the alarm device sends out an alarm signal to give an alarm, so that workers are prompted conveniently.

Description

technical field [0001] The invention relates to the field of valves, in particular to a rapid cooling method for a tower tube. Background technique [0002] The wind power tower is the tower pole of wind power generation, which mainly plays a supporting role in the wind power generation unit and absorbs the vibration of the unit at the same time. [0003] For example, the Chinese patent whose authorized notification number is CN111163611A discloses a wind turbine tower cooling device, which includes: a tower platform located at the bottom of the tower and sealed with the tower wall, arranged below the tower platform and The tower air inlet located on the tower wall, the exhaust fan installed on the tower wall opposite the tower air inlet and located at the air outlet of the electrical components inside the tower, and the exhaust fan connected to the outside of the tower wall The air duct also includes: a grill plate arranged at a preset position of the tower platform for in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F03D17/00F03D80/60
CPCF03D17/00F03D80/60Y02E10/72
Inventor 李轶群周富强梁浩张为社王林杰李世雄安伯龙臧坤张舒赵帝沈明强沈文迪刘博
Owner 景能科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products