Information engineering supervision project image progress management system

A technology of information engineering and progress management, applied in data processing applications, instruments, office automation, etc., can solve problems such as inability to achieve fast use, fixed and inaccurate overall function realization effect, and meet technical support and guarantee and improve supervision Service standards, the effect of promoting efficiency

Active Publication Date: 2021-06-15
北京中百信信息技术股份有限公司
View PDF8 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) At present, with the increasingly complex and large-scale engineering project management, the exchange and transmission of project information is becoming more and more frequent. However, the coupling between the functional modules of the existing enterprise management subsystem and the functional modules of the production management subsystem The degree is high, and the overall function realization effect is relatively fixed
As a result, the existing supervision system cannot meet the actual needs of rapid customization and rapid release
Often just want to adjust a small function but have to wait for a complete renovation at the overall system level, which consumes a huge amount of man-hours, neither quick adjustment nor quick use can be achieved
[0005] (2) The existing supervision system can be managed in accordance with the supervision management industry standards and industry regulations, but the supervision standards of the system only stipulate what behaviors are involved, but there is no regulation and the time and duration of management behaviors, so that it is impossible to control supervision Control the cost of personnel input in the project
It is even more difficult to grasp the working conditions of project members, keep abreast of the progress of the project, and cannot accurately grasp the project
[0006] (3) The functions and data of the enterprise management part and the production (project) management part in the supervision system cannot be shared and integrated, and the senior management of the enterprise cannot timely understand the accurate project statistics such as the project cost of the entire department and the entire company, and often need to select projects separately Manual accounting of the data is necessary to understand the overall profit data of the company, which is neither timely nor accurate, and requires manpower for unified accounting, wasting resources
[0007] (4) The project management part of the existing supervision system means that the person in charge of the project assigns personnel to the work tasks, and other roles cannot make further personnel adjustments according to the changes in project tasks and actual implementation, so that the actual task allocation and The actual participants are often not matched, unable to reflect the real implementation situation, causing large deviations in project control and subsequent cost accounting
[0008] (5) The role and authority configuration of the existing supervision system is relatively fixed and single, and it is impossible to adjust the user authority of the system according to changes in the actual enterprise system and work process, so that the business operation requirements cannot be realized, and only new research and development can be carried out

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Information engineering supervision project image progress management system
  • Information engineering supervision project image progress management system
  • Information engineering supervision project image progress management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0079] Specifically, as figure 1 As shown in the schematic diagram of the overall functional module composition of the present invention, the core method used by the present invention to realize personalized customization is to analyze and summarize 36 events covering supervision service planning and design, deployment implementation, and operation and maintenance according to supervision industry standards as supervision projects The executed basic service units (36 supervision standard events listed in Table 1) form event templates, which are distributed in the corresponding milestone stages of the supervision project, and the basic service units are further disassembled into hundreds of task events for Personnel distribution and collection of man-hours are analyzed by system algorithms to realize hierarchical management of the implementation process of supervision projects, accurate tracking of project progress, and lean analysis of costs at all levels.

[0080]

[0081]...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The information engineering supervision project image progress management system comprises a project module, a working module, a man-hour module, a timing module, an early warning management module, a project guide module and a project display module. A project establishment application module is used for collecting project information including project establishment types, project full names, project attributes, project levels, project properties, proprietors, project types, contract amounts, project managers, execution places, belonging industries, general supervision engineers and auditing personnel, generating a project basic information form with project numbers as keywords, and transmitting the information to the project approval module of the authorized user step by step for approval. The project guide module displays the time range and the current state of each stage of the project in a list form, and the project display module displays the time range and the current event task state of each event task stage of the project, so that the whole supervision project period and the three-dimensional accurate guidance of a manager on the project are realized, the supervision project management efficiency is improved, and the management cost is reduced.

Description

[0001] This application is a divisional application with an application date of July 9, 2020, an application number of 202010658999.4, and a title of "Information System Engineering Supervision Project Guidance and Management System". technical field [0002] The invention belongs to the field of computer application technology, and more specifically relates to an information engineering supervision project image progress management system. Background technique [0003] With the continuous advancement of informatization, big data, and Internet technology, some software systems for supervision project management have emerged in the information system engineering supervision industry to realize data information management in the project supervision process, and to a certain extent It has played a positive role in improving the standardization, digitization and management efficiency of the management process. Specifically, the functions of the existing traditional supervision p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 刘庆波张玉杰周威马达卢学哲崔秀文张洪冯本锐况文婷王莉邹晓光王安纲史纪良翁圻刘纯利唐勇陈志勇张玲志
Owner 北京中百信信息技术股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products