Advanced geology forecasting method for moraine layer tunnel

A technology of advanced geological prediction and tunneling, applied in seismology, seismic energy generation, seismic signal processing, etc., can solve problems such as long construction period, high cost, and failure to meet forecast requirements

Pending Publication Date: 2021-05-18
NO 5 ENG OF CHINA RAILWAY 19 BUREAU GRP +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Advanced geological prediction mainly includes methods such as advanced pilot pit and advanced drilling. These methods have long construction period and high cost
However, the moraine layer is more complex, and the existing advanced geological prediction methods cannot meet the prediction requirements.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Advanced geology forecasting method for moraine layer tunnel
  • Advanced geology forecasting method for moraine layer tunnel
  • Advanced geology forecasting method for moraine layer tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The present invention will be further described now in conjunction with accompanying drawing.

[0022] Such as Figure 1 to Figure 6 As shown, the advanced geological prediction method for moraine layer tunnels includes the following steps: advanced horizontal drilling; information collection; professional judgment, which includes the interpretation of the possibility of water and mud gushing, the interpretation of the possibility of high ground temperature, and the possibility of soft rock deformation. Interpretation of nature, rockburst possibility, and other geological diseases; design unit; dynamic design; implementation of construction; post-construction confirmation and review of forecast results.

[0023] Advanced horizontal drilling includes: geological survey method, seismic wave emission method, geological radar method, infrared detection method, deep blast hole method and advanced drilling method.

[0024] The advanced geological prediction method of moraine...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a geological forecasting method, in particular to an advanced geological forecasting method for a moraine layer tunnel. The method comprises the following steps of: advanced horizontal drilling; collecting information; performing professional judgment which comprises water and mud burst possibility interpretation, high ground temperature possibility interpretation, soft rock deformation possibility interpretation, rockburst possibility interpretation and other geological disease interpretation; designing a unit; performing dynamic design; carrying out construction; and carrying out post-construction confirmation and re-checking on a forecast result. The advanced geological forecasting method for the moraine layer tunnel mainly adopts horizontal drilling for forecasting, is suitable for moraine layers, and is accurate in forecasting and low in cost.

Description

technical field [0001] The invention relates to a geological prediction method, in particular to a method for advanced geological prediction of a moraine layer tunnel. Background technique [0002] Geological forecasting is to find out the hidden major geological problems that are difficult to detect due to the limitations of the previous geological survey work, predict the adverse geological disasters in front of the construction tunnel face, and then correctly guide the safe construction of the tunnel project and reduce the occurrence of geological disasters. probability and risk. [0003] Advanced geological prediction mainly includes methods such as advanced pilot pit and advanced drilling. These methods have long construction period and high cost. The moraine layer is more complex, and the existing advanced geological prediction methods cannot meet the prediction requirements. Contents of the invention [0004] In order to solve the above problems, the present inven...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01V1/13G01V1/30G01S13/88
CPCG01V1/13G01V1/306G01S13/885
Inventor 陶琦关喜彬韩希平周烨何旭罗振平黄云刘国强刘昌济王奇国玉龙郭义肖群胡啸刘祥敏王海东
Owner NO 5 ENG OF CHINA RAILWAY 19 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products