Concrete beam column connecting joint and temporary support mounting method

A beam-column connection and concrete technology, which is applied to building components, earthquake resistance, building types, etc., can solve problems such as troublesome disassembly and installation, difficult welding, and high difficulty in operation.

Pending Publication Date: 2021-05-07
雄安绿研检验认证有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional all-welded and bolt-welded hybrid joints need to weld steel beams and steel pipe columns on site. The welding is difficult, the weld strength is low, and the stability is poor. Difficult to disassemble and install

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete beam column connecting joint and temporary support mounting method
  • Concrete beam column connecting joint and temporary support mounting method
  • Concrete beam column connecting joint and temporary support mounting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The technical details of the present invention will be described in detail through examples below in conjunction with the accompanying drawings, but the scope of the present invention will not be limited in any way.

[0041] Such as figure 1 As shown, the structure of the concrete beam-column connection node and temporary support provided in this embodiment mainly includes a prefabricated column 1, a prefabricated beam 2, an energy-dissipating steel cylinder 3, an installation clamp 4, and an installation bracket 5, wherein the lower end of the upper prefabricated column 1 It is connected with the upper end of the prefabricated cylinder 1 on the lower floor through the energy-dissipating steel cylinder 3, and the prefabricated beam 2 is horizontally connected to the side of the energy-dissipating steel cylinder 3.

[0042] Wherein, the structure of prefabricated cylinder 1 is as follows figure 2As shown, when the cylinder is prefabricated, the flange 1-2 is pre-embedd...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a concrete beam column connecting joint and a temporary support mounting method, and belongs to the technical field of fabricated building engineering. An upper layer of prefabricated cylinders and a lower layer of prefabricated cylinders are connected through energy-consuming steel cylinders, and prefabricated cross beams are transversely connected to the side faces of the energy-consuming steel cylinders through mounting clamping pieces. H-shaped steel is arranged in a concrete beam column, the energy-consuming steel cylinders are mounted at the connecting joint, the overall stability of a column body structure is improved, meanwhile, the damping energy characteristic is eliminated, and additional reinforcement is not needed; a mounting support is connected through column body pre-planted support fixing feet, damage of manual operation to a column body during supporting is reduced, and the field work efficiency is improved while the connecting strength is guaranteed; and through the beam column flange type outer ring plate full-bolt connecting joint, welding work can be completed in a factory, component mounting is completed only by screwing bolts on a construction site, the adverse effects of the welding line quality, the welding residual stress and the like on the joint stress performance can be avoided, the ductility of the joint is improved, and the difficulty of field construction quality control is further lowered.

Description

technical field [0001] The invention belongs to the technical field of prefabricated construction engineering, and in particular relates to a concrete beam-column connection node structure containing H-shaped steel and a temporary support installation method. Background technique [0002] At present, the prefabricated composite structure belongs to the initial stage in our country. The construction method of the prefabricated composite structure building is to manufacture the main components and parts of the building in the factory, and then transport them to the site. After mechanized installation, a building that meets the predetermined functional requirements is formed. The prefabricated steel-concrete composite structure building has the advantages of good seismic performance, high construction quality, simple fabrication, high degree of industrialization, green and energy saving, etc. Nodes are the main part of the composition and stress of the structural system. Desig...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04B1/21E04G21/00E04B1/98E04H9/02
CPCE04B1/215E04B1/98E04G21/00E04H9/021
Inventor 赵海南樊龙杨鑫郭顺智韩振胡韩飞郭少雄聂鑫鑫佘金盼
Owner 雄安绿研检验认证有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products