Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Demand side off-peak resource management system

A resource management system and technology on the demand side, applied in the field of big data-driven management systems, can solve problems such as difficulty in adjusting loads on the power supply side, achieve fast and accurate response behaviors, reduce pressure on the power grid, and improve adjustment flexibility

Pending Publication Date: 2021-03-19
CHINA REALTIME DATABASE +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Purpose of the invention: The present invention aims to solve the above-mentioned deficiencies in the prior art, provide a resource management system for load shifting on the demand side, and solve the problem of difficult load adjustment on the power supply side

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Demand side off-peak resource management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The technical solution of the present invention will be further described below in conjunction with the accompanying drawings.

[0016] Depend on figure 1 It can be seen that the demand-side staggered peak resource management system described in the present invention includes a peak staggered data preprocessing module, a power consumption behavior analysis module, a refined user power consumption prediction module, a staggered peak resource potential analysis module, and a staggered peak resource plan arrangement module , new energy business analysis module and tram business analysis module. The staggered data preprocessing module includes data extraction, data storage and management, data source configuration, data conversion job management and data conversion job execution engine configuration. The staggered data preprocessing module includes data extraction, data storage and management, data source configuration, data conversion job management and data conversion jo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a demand side off-peak resource management system which comprises an off-peak data preprocessing module, a power consumption behavior analysis module, a refined user power consumption prediction module, an off-peak resource potential analysis module, an off-peak resource scheme arrangement module, a new energy service analysis module and a tramcar service analysis module. The off-peak data preprocessing module provides data drive for other modules; the power consumption behavior analysis module analyzes the power consumption mode and the consumption habit of the user; the refined user power consumption prediction module predicts user power consumption; the off-peak resource potential analysis module obtains the peak shifting potential of the user; the off-peak resource scheme arrangement module obtains a off-peak scheme according to an analysis result of the off-peak analysis module; the new energy service analysis module monitors the new energy data and generates a measurement report according to the new energy cost benefit and the off-peak output value; and the tramcar service analysis module monitors the condition of the tramcar. According to the invention, orderly peak clipping and valley filling are carried out, and the power grid pressure in the peak period of power utilization is reduced.

Description

technical field [0001] The invention relates to a management system driven by big data, in particular to a resource management system for demand-side staggered peaks. Background technique [0002] At present, the peak-to-valley difference of the average day-night power demand in most cities in China exceeds 60%, and the sharp increase in air-conditioning load has become an important reason for the deterioration of grid load characteristics and power shortage in summer. In order to ensure the safety of the large power grid, dispatching can only use the "ultimate" means of switching off the power. In 1996, State Grid Shanghai Electric Power finally found a feasible method - relying on the power load management system to monitor and control the city's power load. After 22 years of construction, the Shanghai Electricity Load Management System has 1 main station, 14 communication base stations, and nearly 28,500 load management terminals, basically covering the 10 kV and above p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q50/06G06F16/90G06F16/906G06Q10/04G06Q10/06
CPCG06Q50/06G06F16/90G06F16/906G06Q10/04G06Q10/06312Y04S10/50Y04S50/16Y02P90/82
Inventor 王渊孙亚运
Owner CHINA REALTIME DATABASE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products