An insulation monitoring method for completing the connection of charging piles online
A technology for insulation monitoring and charging piles, which is used in short-circuit testing, testing circuits, and testing dielectric strength. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The technical solution of the present invention will be further described in detail below in conjunction with specific examples, but the protection scope of the present invention is not limited to the following description.
[0019] An insulation monitoring method for completing charging pile connection online, comprising:
[0020] 1) The live wire of the three-phase line of the charging pile is connected to the first coil n1, and the second coil n2 is connected between the live wire and the ground wire, so that the mutual induction coil is formed between the first coil n1 and the second coil n2, wherein the first coil The number of turns of n1 is smaller than that of the second coil n2;
[0021] 2) Connect an ammeter A1 to the first coil n1 circuit to measure the current of the first coil n1. If the ammeter A1 reads, it means that the live wire and the ground wire form a closed loop, indicating that the charging pile is leaking, and the ammeter A1 reads 0 Then the cha...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com