Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A kind of super-deep and large-diameter bored pile hole forming method

A drilling pile and hole-forming technology, which is applied in drilling equipment and methods, directional drilling, earth-moving drilling, etc., can solve the problems of large vibration interference, small environmental impact, low construction efficiency, etc., so as to reduce costs and save materials. , the effect of good social benefits

Active Publication Date: 2022-08-02
CHINA RAILWAY NO 8 ENG GRP CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] CN 104047543A discloses "a construction method for forming holes with large-diameter bored piles in high-strength rock formations". By adopting multiple coring methods and using drill bits of different diameters, multiple cores are taken from high-strength rock formations , and finally completed the drilling of the bored pile embedded in the rock, which effectively solved the problems of low construction efficiency and large vibration interference in the existing technology, improved the quality of the hole, reduced the construction risk, etc., and has the advantages of fast construction speed and environmental protection The characteristics of small impact and high economic benefit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of super-deep and large-diameter bored pile hole forming method
  • A kind of super-deep and large-diameter bored pile hole forming method
  • A kind of super-deep and large-diameter bored pile hole forming method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be further described below in conjunction with the accompanying drawings.

[0039] see Figure 1 to Figure 9 , the described method for forming a hole for an ultra-deep large-diameter bored pile is characterized in that it comprises the following steps:

[0040] The first step is to make the guide frame of the protective tube;

[0041] The protective tube guide frame 1 adopts a double-layer frame structure, and the connection system, the column and the guide support of the protective tube guide frame 1 are respectively made of double-joint 20a, 25a and 40a channel steel;

[0042] The second step is positioning the guide frame of the protective tube;

[0043] The casing guide frame 1 is hoisted to the drilling platform 3 by a 60t gantry crane 2 for positioning;

[0044] The third step is to insert the steel protective tube;

[0045] First, a 16mm steel plate is rolled in the field to make a 8m section of steel casing, and then the steel cas...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for forming a hole for an ultra-deep and large-diameter bored pile. Steel casing; the fourth step, the drilling rig is in place; the fifth step, the mud circulation system is arranged and the mud is prepared; the sixth step, the opening; the seventh step, the first-level reaming; the eighth step, the second-level reaming ; The ninth step, three-stage reaming; the tenth step, the hole detection. The invention can complete the hole forming of the large-diameter and ultra-deep bored piles without the special drilling machine for the ultra-deep and large-diameter bored piles, and has high hole-forming precision and short hole period, which can ensure safety and reduce costs.

Description

technical field [0001] The invention relates to bridge engineering, in particular to a method for forming a hole for an ultra-deep and large-diameter bored pile. Background technique [0002] The design and construction level of large-diameter bored piles for bridges in my country are in the forefront of the world. For large bridge projects, bored piles are generally used as the preferred foundation form. At present, the largest recorded diameter of bored piles in China is Wuhan Tianxingzhou Bridge. The piles are 76m long and 3.4m in diameter. They are rock-socketed piles. The maximum pile length of a single pile is the North Channel Bridge of the Hangzhou Bay Cross-sea Bridge, whose pile length has exceeded 125m and the pile diameter is 2.8m, which is a friction pile. At present, only the KTY-3000 gas lift reverse circulation drilling rig of China Railway Bridge Bureau can be drilled into place at one time, and the conventional single drilling equipment and construction m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B7/136E21B7/04E21B7/20E21B21/06E21B7/28E21B21/16E21B47/00
CPCE21B7/136E21B7/043E21B7/20E21B21/06E21B7/28E21B21/16E21B47/00
Inventor 闫春勇任历文许清朱张毅左晴雯朱亚强郭小伟
Owner CHINA RAILWAY NO 8 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products