Multistage filled basement waterproof device and application method
A basement and filling technology, which is applied in the direction of water supply devices, sewer pipe systems, general water supply conservation, etc., can solve the problems of no drainage disinfection treatment, the rainwater prevention effect needs to be improved, and the service life is limited, so as to prevent diseases and Epidemic outbreak, improved operability and convenience, good effect in stopping
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Such as Figure 1-7 As shown, a multi-stage filled basement anti-water device includes a plurality of main bodies 1 and concrete structures 2, the concrete structures 2 are embedded in the surface of the road 3 and are flush with it, and multiple main bodies 1 are installed side by side on the concrete structures 2 and connected with them active connection;
[0055] Concrete structure 2 includes drainage channel 21, water collection channel 22, water pump 23 and connecting channel 24, and water collecting channel 22 is located at the side of drainage channel 21, and the position of water collecting channel 22 is lower than that of drainage channel 21, and drainage channel 21 connects with collecting channel 24 through connecting channel 24. The water channel 22 is connected through, the water pump 23 is placed inside the water collection channel 22, and the outlet pipe of the water pump 23 is placed outside the device;
[0056] The main body 1 includes a hydraulic plat...
Embodiment 2
[0068] This embodiment is a further improvement of the previous embodiment, such as Figure 1-7 As shown, a multi-stage filled basement anti-water device includes a plurality of main bodies 1 and concrete structures 2, the concrete structures 2 are embedded in the surface of the road 3 and are flush with it, and multiple main bodies 1 are installed side by side on the concrete structures 2 and connected with them active connection;
[0069] Concrete structure 2 includes drainage channel 21, water collection channel 22, water pump 23 and connecting channel 24, and water collecting channel 22 is located at the side of drainage channel 21, and the position of water collecting channel 22 is lower than that of drainage channel 21, and drainage channel 21 connects with collecting channel 24 through connecting channel 24. The water channel 22 is connected through, the water pump 23 is placed inside the water collection channel 22, and the outlet pipe of the water pump 23 is placed ou...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com