Project progress visualization method and system based on work structure decomposition
A project progress and project technology, applied in the field of project progress visualization method and system based on work structure decomposition, can solve the problem of inconvenient adjustment of project progress chart, achieve the effect of flexible editing and improve production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] This embodiment discloses a project progress visualization method based on work structure decomposition, such as figure 1 shown, including the following steps:
[0029] Step 1: Collect the progress data of various types of historical projects in advance, construct the project decomposition structure diagrams of various projects, and obtain a set of standardized project decomposition structure diagrams.
[0030] The progress data includes subtasks included in the project and corresponding completion time.
[0031] The project decomposition structure diagram preferably adopts a tree diagram, which divides the project into multiple first-level subtasks, and each first-level subtask is divided into multiple second-level subtasks...until each subtask cannot be divided. That is, the root node represents the entire project, the second-level node represents the first-level subtask, ..., and the leaf node represents the lowest-level subtask of the subtask, and, for a certain su...
Embodiment 2
[0053] The purpose of this embodiment is to provide a project progress visualization system based on work structure decomposition, and the system includes:
[0054] The item type determination module receives the item name and identifies the item type, or receives the specified item type;
[0055] The project decomposition structure diagram generation module obtains the corresponding project decomposition structure diagram from the set of standardized project decomposition structure diagrams according to the project type; wherein, the standardized project decomposition structure diagram set is constructed according to the project progress data of various project categories owned;
[0056] The initial progress diagram visualization module generates an initial project progress diagram, and visualizes the initial project progress diagram, or visualizes the initial project progress diagram and the project decomposition architecture diagram;
[0057] The progress diagram editing m...
Embodiment 3
[0059] The purpose of this embodiment is to provide an electronic device.
[0060] An electronic device includes a memory, a processor, and a computer program stored in the memory and operable on the processor. The processor implements the method described in Embodiment 1 when executing the program.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com