Single-point hoisting type pile erecting system and construction method for pile erecting

A construction method and pile technology, applied in the direction of load hanging components, assembly of wind turbines, installation/support configuration of wind turbines, etc., can solve the problems of high construction cost, high hoisting requirements, high cost, etc., and achieve construction cost Low weight, low hoisting requirements and low equipment cost

Active Publication Date: 2020-08-14
NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG +1
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In some projects, wind power piles are lifted by setting two lifting hooks on a single lifting ship, which requires each lifting hook to meet the pile weight requirements. The requirements for the lifting weight of the ship are high, the cost of the crane ship is high, and the construction cost is high
In other projects, two lifting ships are used to lift the lifting points on both sides of the wind power piles, one of which is used as the main lifting ship to mainly carry the pile weight, and the other is used as an auxiliary pile , however, this method of piling requires two crane ships, and the construction cost is high and the sea area is large
In addition to the two-point lifting pile method, some projects are constructed with a full-slewing crane and a pile turner. Among them, the full-slewing crane mainly carries the pile weight, and the pile turner is used to assist the pile. However, this kind of pile In the method, the full-slewing crane needs to meet the pile weight requirements, and the cost is relatively high. Moreover, since the full-slewing crane can only provide a single point of lifting force, the pile turner usually needs to be equipped with pushing parts for pushing the wind power pile to turn over, such as hydraulic rods, etc. , its cost is also higher, and the overall construction cost is higher
If the pile turner is not equipped with pushing parts, in order to realize the single-point lifting of the pile, it needs to overcome the horizontal force of at least 200-300t, which cannot be met by the conventional ship mooring system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Single-point hoisting type pile erecting system and construction method for pile erecting
  • Single-point hoisting type pile erecting system and construction method for pile erecting
  • Single-point hoisting type pile erecting system and construction method for pile erecting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In the following, the present invention will be specifically described through exemplary embodiments. It should be understood, however, that elements, structures and characteristics of one embodiment may be beneficially incorporated in other embodiments without further recitation.

[0031] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "inner", "outer", "upper", "lower", "top", "bottom" etc. are based on the attached figure 1 The positional relationship shown is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as limiting the present invention .

[0032] Such as Figure 1-Figure 4 As shown, the embodiment of the present invention relates to a single-p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a single-point hoisting type pile erecting system and a construction method for pile erecting, and belongs to the technical field of offshore wind power pile foundation construction. The single-point hoisting type pile erecting system and the construction method for pile erecting realize single-point hoisting type pile erecting of an offshore wind power pile. The single-point hoisting type pile erecting system involves a crane, a guide frame, a pile turning device, a clamping block and a hoisting point, wherein the clamping block and the hoisting point are arranged on apile body; the clamping block and the hoisting point are arranged close to the two axial ends of the pile body, and the clamping block is located on the lower side surface of the pile body when the pile body is horizontally placed; a hoisting cable of the crane is connected with the hoisting point; the guide frame is fixedly supported on the seabed at the position of the pile to be erected, the guide frame is located below the end, provided with the clamping block, of the pile body when the pile body is horizontally placed, and a U-shaped opening for allowing the pile body to be turned thereinand limiting the position of the erected pile body is formed in the side, away from the hoisting point, of the guide frame; the pile turning device is arranged on the side, away from the U-shaped opening, of the top of the guide frame, the pile turning device turns towards the direction of the U-shaped opening, the pile turning device supports the lower side surface of the pile body when the pilebody is horizontally placed, and the side, close to the hoisting point, of the pile turning device is abutted against the side, away from the hoisting point, of the clamping block.

Description

technical field [0001] The invention belongs to the technical field of offshore wind power pile foundation construction, and in particular relates to a single-point lifting pile system and a pile construction method. Background technique [0002] The pile weight of wind power piles is usually 600-1200t. At present, in the construction of offshore wind power pile foundations, two-point lifting is usually used to erect piles. In some projects, wind power piles are lifted by setting two lifting hooks on a single lifting ship, which requires each lifting hook to meet the pile weight requirements. The requirements for the weight of the ship are high, the cost of the crane ship is high, and the construction cost is high. In other projects, two lifting ships are used to lift the lifting points on both sides of the wind power piles, one of which is used as the main lifting ship to mainly carry the pile weight, and the other is used as an auxiliary pile However, this method of pili...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B66C13/08F03D13/10F03D13/25
CPCB66C13/08F03D13/10F03D13/25Y02E10/727Y02E10/72
Inventor 刘德进王翔冯甲鑫鞠鹏王明玉付大伟
Owner NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products