A construction method and pile foundation technology, which can be applied to foundation structure engineering, sheet pile walls, buildings, etc., can solve the problems of low single pile bearing capacity, low engineering cost, friction, impact, etc., to reduce transportation costs and improve load capacity , Improve the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0039] refer to figure 1 , is a kind of pile foundation construction method disclosed by the present invention, comprises the following steps:
[0040] Step S1, construction preparation:
[0041] Step S1.1 Pre-construction preparation The clear water well should be dug in an area without piles, and the proximity to the mud pool can bring convenience for water replenishment. The mud pool should be dug in an area without engineering piles near the main building. Firstly, the bulldozer is used to level the site. After the equipment enters the site, installation and commissioning are carried out, and the piling sequence is determined according to the site construction conditions.
[0042] Step S1.2 Measure and stake out. After the site is leveled, make a measurement control network according to the design coordinate points, position according to the plane setti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com