Method for northern low hilly area river bank side zone ecological construction
A technology for rivers and hills, which is applied in the field of ecological construction of river banks, can solve problems such as unreasonable selection of tree species, high cost, and limited ecological functions, and achieve the effects of controlling soil erosion, improving water and soil conservation capacity, and good ecological functions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0019] Specific implementation mode one: the method for the ecological construction of the river bank zone in the northern low mountain and hilly area of the present implementation mode is carried out according to the following steps:
[0020] 1. Repair the river bank zone, which is composed of the bank and bank slope of the river bank zone;
[0021] 2. Plant trees on the bank of the river bank, plant shrubs at the bottom of the bank slope, and plant herbaceous plants on the bank slope;
[0022] 3. After the vegetation on the river bank grows for 0.5-1.5 years, carry out watering or replanting maintenance; that is, the ecological construction of the river bank in the northern low mountain and hilly area has been completed.
[0023] figure 1 It is a schematic diagram of the ecological construction of the river bank zone in the northern low mountain and hilly area in this embodiment. figure 1 As shown), the bank slope is composed of the bank slope surface and the bank slope ...
specific Embodiment approach 2
[0034] Embodiment 2: Embodiment 1 is different in that: in step 1, the width of the bank of the river is not less than 4m, and the terrain is flat. Others are the same as one of the specific embodiments 1 to 4.
specific Embodiment approach 3
[0035] Embodiment 3: The difference between Embodiment 1 and Embodiment 2 is that in step 1, the angle between the bank slope of the river bank and the horizontal plane is less than 60°, and the slope surface is flat. Others are the same as in the first or second embodiment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com