Method of installing direct current cables in wind turbine cabin
A technology for wind turbines and DC cables, which is applied in the installation of cables, cable installation devices, wind engines, etc. It can solve the problems of unstable cables, long working hours, and high labor intensity, and achieves simple structure, high work efficiency, and reduced Effect of Installation Difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0041] The installation method of the DC cable in the wind turbine nacelle includes the following steps:
[0042] Step 1, place the cable reel at the rear of the cabin, pull the head of 1 cable from the cable reel to the cable ladder, then guide the cable through the rollers on the cable ladder, and pull the cable from the cabin to the cable ladder. The duct of the tower is pulled to the duct end of the engine room, which effectively reduces the difficulty of installation, thereby reducing installation time consumption and cost;
[0043] Step 2, when the cables are all pulled out from the cable reel, place the cables on the cable ladder, making sure there are more cables than required, so that there is enough margin for the cables under the inverter end on the machine side, Facilitate subsequent operations;
[0044] Step 3: Connect the cable lug on the inverter side of the machine to the busbar system, and then install the EMC clip on the cable;
[0045] Step 4: Continue to ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com