A construction method for the shield machine to go under the existing station and start
A technology with existing stations and construction methods, applied to earth drilling, underground chambers, shaft equipment, etc., can solve problems such as settlement overrun, easy over excavation, noise, vibration, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] The present invention will be further described below in conjunction with accompanying drawing.
[0052] see Figure 1 to Figure 7 , the shield tunneling machine of the present invention passes through the existing station originating construction method, adopts steel sleeve construction and includes the following processes: leveling the bottom plate of the passageway under the tunnel and laying steel plates, reinforcing the ends, installing the lower semicircle of the steel sleeve, and shield tunneling Downhole installation of the machine, overall vertical movement of the steel sleeve and the shield machine, removal of the door, installation of negative ring segments, backfilling of the steel sleeve, pressure test, removal of the frozen pipe and sealing of the frozen hole, and the start of the shield machine.
[0053] The steel sleeve consists of the first to fourth main cylinders of the same length spliced from front to back, a transition ring connected to the front...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com