Construction method for leveling top surface of bearing during second-time beam lowering after jacking

A construction method and top technology, applied in the direction of bridge, bridge maintenance, bridge reinforcement, etc., can solve the problems of unsafe bridge, unstable structure, weak bonding between steel plate and steel plate, etc., to ensure the overall stress of the bearing, The effect of prolonging the service life and reducing the risk of bridges

Inactive Publication Date: 2020-02-25
四川成通加固工程有限公司
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to solve various diseases after the replacement of the new support, one common treatment method is to use thin steel plates to plug the gap between the bottom of the beam and the top surface of the support layer by layer. The disadvantage of this method is that the structure after the number of steel plate layers Instability, the bond between the steel plate and the steel plate is not firm, the contact surface between the steel plate and the support and the contact surface between the steel plate and the bottom of the beam cannot be fully contacted, so that the force on the support and the beam is uneven
[0005] The other is to use a wedge-shaped steel plate plug between the bottom of the beam and the top surface of the support. The disadvantage of this method is that the shape of each gap is not exactly the same, and it needs to be processed separately, which is time-consuming and labor-intensive. There is also the need to measure the bottom of the beam and the top of the support. The surface shape can only be measured when the beam is completely lifted from the support and is in the empty state. Keeping the beam in the headspace state for a long time will cause great unsafety of the bridge

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for leveling top surface of bearing during second-time beam lowering after jacking

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] Such as figure 1 Shown is a flow chart of the present invention,

[0030] In this embodiment, the replacement of road bridge bearings on the section from Chengdu to Nanchong is taken as an example: the construction will be carried out in June, and the specific operation is a construction method for leveling the top surface of the beam bearings for the second time after lifting, which includes the following steps:

[0031] S1. Use a fully automatic jacking system to lift the entire beam body to 10mm, and take out the old support. Specifically, the construction personnel determine the jacking height according to the actual situation on site and make fine adjustments. It may not be necessary to jack up to 10mm, and the old support can be taken out, or it may be necessary to jack up to more than 10mm, before the old support can be taken out. The smaller the jacking height, the safer the bridge.

[0032] S2. Construction personnel use angle grinder to grind, grind the top ...

Embodiment 2

[0043] In this embodiment, the replacement of road bridge bearings on the section from Chengdu to Nanchong is taken as an example: the construction will be carried out in October, and the specific operation is a construction method for leveling the top surface of the beam bearing for the second time after lifting, which includes the following steps:

[0044] S1. Use automatic jacking equipment to lift the whole beam body to a suitable height, and take out the old support;

[0045] S2. Use an angle grinder to grind the top surface of the support pad stone and the bottom of the beam, and remove loose concrete;

[0046] S3, coat epoxy mortar on the top of the pad stone to make the top surface of the pad stone smooth;

[0047] S4. Use adhesive tape to wrap around the support and protrude from the top surface of the support by 10mm, form a template with a height of 10mm on the top surface of the support, and cut an opening at the top of the four corners of the template;

[0048] S...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method for leveling a top surface of a bearing during second-time beam lowering after jacking. The construction method forms a high-strength and compact fillingbody between a beam bottom and the top surface of the bearing, so that the newly replaced bearing can bear pressure in an overall balanced manner and the service lives of the bearing and a bridge canbe prolonged. The construction method levels the bearing by virtue of mortar which can perform automatic leveling according to the shape of the bottom of a beam body, thereby avoiding the disadvantagethat steel plates are prone to slide down and the bearing can not be in full contact with the beam body resulting in bias pressure on the bearing when the steel plates are used for leveling, ensuringthat the top surface of the bearing is in full contact with the beam bottom, and enabling stress on the bearing to be uniform.

Description

technical field [0001] The invention relates to the technical field of road and bridge construction, in particular to a construction method for leveling the top surface of a secondary drop beam support after jacking. Background technique [0002] As the first batch of expressways completed in my country have been open to traffic for more than 10 years, expressway bridges have entered the peak period of maintenance. The bridge bearing is an important component connecting the upper and lower structures of the bridge. According to different types, the normal design and service life of the bridge bearing is about 10-15 years. When the bridge bearing reaches the design life or if there is a disease in the bridge inspection, it needs to be replaced with a new bridge bearing. [0003] The current process for replacing bridge supports is to use a fully automatic jacking system to lift the entire beam body off the surface of the support, take out the old support, replace it with a n...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D22/00
CPCE01D22/00
Inventor 孙辉黄顺旺唐彬
Owner 四川成通加固工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products