Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Prefabrication method of prefabricated foundation ring beam and storage tank construction method using the product

A construction method and technology of basic ring, applied in basic structure engineering, construction, etc., can solve the problems of difficult quality control, discontinuous operation process, large workload, etc., and achieve easy quality control, cost saving, and economical The effect of resources

Active Publication Date: 2021-10-01
中国石油工程建设有限公司华北分公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a construction method of an assembled foundation ring beam of an oil depot and a prefabrication method of a foundation ring beam to solve the existing problems in the construction of foundation ring beams such as heavy workload, long construction period, discontinuous operation process and poor quality control. Difficulty and construction risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabrication method of prefabricated foundation ring beam and storage tank construction method using the product
  • Prefabrication method of prefabricated foundation ring beam and storage tank construction method using the product
  • Prefabrication method of prefabricated foundation ring beam and storage tank construction method using the product

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The following is attached figure 1 - attached Figure 6 And embodiment technical scheme of the present invention is described in detail:

[0028] Such as image 3 As shown, the foundation ring beam part of the tank body is formed by connecting the foundation ring wall 1 and the ring wall 2 at the post-casting zone. In the embodiment of the present invention, the foundation ring wall 1 and the ring wall 2 at the post-casting zone are divided into several arcs Shaped ring wall prefabricated components, the ring wall prefabricated components are prefabricated in advance, and then the prefabricated ring wall prefabricated components are transported to the site, and the prefabricated ring wall components are wet-connected by post-casting belts, and the prefabricated ring wall The prefabrication method of prefabricated components is described in detail as follows:

[0029] Before prefabricating the ring beam components, it is necessary to carry out the standardized design ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for prefabricating an assembled foundation ring beam and a storage tank construction method using the product. The preparation process of the prefabricated foundation ring beam includes measuring and setting out the line, laying the bottom mold of the prefabricated component, installing the positioning stirrup, installing the sealing mold at both ends of the anchoring prefabricated component, installing the horizontal circular steel bar, binding the vertical stirrup firmly, installing the pre-embedded Components, installation of inner and outer vertical steel forms of prefabricated components, concrete pouring, maintenance, and formwork removal. Application, the tank construction process of the prefabricated foundation ring beam, including project positioning and setting out, prefabrication of ring wall prefabricated components, foundation trench excavation, cushion concrete pouring, prefabricated ring wall prefabricated components reverse transportation, prefabricated ring wall prefabricated components assembly Calibration, wet connection of ring wall prefabricated components, tank core graded sand and gravel backfill, sand cushion backfill, asphalt sand laying, acceptance and other steps. The invention can realize the standardization of products and the continuity of the construction process, improve the quality of the structures, shorten the construction period, reduce the influence of weather and labor on the construction quality, and reduce the construction pollution on site.

Description

technical field [0001] The invention belongs to the field of oil depot structures, and in particular relates to a method for prefabricating an assembled foundation ring beam and a storage tank construction method using the product. Background technique [0002] In the construction of the current oil depot project, the construction of the foundation ring beam has always been cast-in-situ. The traditional process is: scaffolding erection-reinforcement binding-formwork support-formwork-concrete pouring-formwork removal, in which both scaffolding and formwork need Set along the entire length of the foundation ring beam, the workload is heavy and the construction period is long. Since the foundation ring beam of the tank is circular, and the circumference of the ring beam is relatively large, it is necessary to set several positioning piles along the circumference during on-site construction to ensure the position of the formwork during installation, which is time-consuming and l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/38E02D27/01
CPCE02D27/01E02D27/013E02D27/38E02D2250/0007E02D2250/0023
Inventor 王永虎李树松李伟张坤胡利强
Owner 中国石油工程建设有限公司华北分公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products