Percussion drill bored pile construction method

A construction method, technology of bored piles, applied in the direction of drilling equipment and methods, percussion drilling, sheet pile walls, etc.

Inactive Publication Date: 2019-12-03
KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP
View PDF5 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a construction method of percussion drilling bored piles, by installing the drilling rig so that the base is horizontal, the lifting pulley rim and the center of the casing should be on the same straight line, And often check the correction, and at the same time, when drilling through the inclined interface of...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Percussion drill bored pile construction method
  • Percussion drill bored pile construction method
  • Percussion drill bored pile construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0056] A construction method for percussion drilling bored piles, the specific construction method is as follows:

[0057] S1. Technical preparation: According to the geological conditions, design drawings, prepare required labor force, construction equipment and required materials;

[0058] S2. Pile hole positioning measurement and setting out:

[0059] S1.1. Calculate the pile position coordinates according to the design drawings. After the pile position coordinates are re...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Outer diameteraaaaaaaaaa
Wall thicknessaaaaaaaaaa
Login to view more

Abstract

The invention relates to a percussion drill bored pile construction method and particularly relates to the technical field of percussion drill bored pile construction. The percussion drill bored pileconstruction method concretely comprises the following steps of S1, technical preparation; S2, pile bore positioning measurement wire laying; S3, mud preparation; S4, boring; S5, pore-forming inspection; S6, pore cleaning; S7, machining and placing of a steel bar cage; S8, underwater concrete pouring; and S9, pile foundation detection. According to the percussion drill bored pile construction method, a pedestal is made horizontal when a drilling machine is installed, hoisting pulley edges and the center of a protection barrel need to be on the same straight line, and inspection and correctionare carried out frequently; meanwhile, when a soft-hard stratum inclined interface is encountered in boring, the measure of carrying out flag refilling first and then continuing drilling is taken to rectify a deviation, a repeated filling measure is taken to carry out deviation rectification until pile-forming is completed if the bore deviation phenomenon occurs repeatedly, and the phenomenon thatas uneven stress of a coning impact face, pore position deviation occurs, and the construction speed is influenced is effectively avoided.

Description

technical field [0001] The invention relates to the technical field of percussion drilling bored pile construction, and more specifically, the invention relates to a construction method of percussion drill bored piles. Background technique [0002] With the development of civil engineering technology, more and more pile foundations are used, and the development trend is to develop super-long and large-diameter pile foundations. The pile foundation is composed of foundation piles and caps connected to the top of the piles. If the pile body is completely buried in the soil and the bottom surface of the cap is in contact with the soil, it is called a low cap pile foundation. If the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. The building pile foundation is usually a low cap pile foundation. Cap pile foundation, in high-rise buildings, pile foundation is widely used. [0003] In the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/34E02D13/04E02D15/04E02D33/00E21B1/00
CPCE02D5/34E02D13/04E02D15/04E02D33/00E21B1/00
Inventor 费腾标魏焰朱伯东陈恩国任金锋
Owner KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products