4D simulation system based on BIM real-time construction model

A simulation system and model technology, applied in the field of 4D simulation system based on BIM real-time construction model, can solve the problems of poor flexibility, inability to target building construction schedule resources, cost and site information visualization management, inability to demonstrate building construction in real time, etc. To achieve the effect of reducing the cost of use

Pending Publication Date: 2019-10-22
死海旅游度假有限公司
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, most of the models used in building construction are 3D models. Although they are good for displaying building structures, they cannot demonstrate the progress of building construction in real time. The flexibility of use is poor, and it is impossible to realize the construction progress, resources, and costs of target buildings. and site information for visual management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • 4D simulation system based on BIM real-time construction model
  • 4D simulation system based on BIM real-time construction model
  • 4D simulation system based on BIM real-time construction model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0051] refer to Figure 1-5 , 4D simulation system based on BIM real-time construction model, including: target building information collection system, BIN modeling system, construction schedule preparation system, model and schedule link processing system and 4D simulation real-time construction model display system;

[0052] The target building information collection system is used to collect and input the information of the target building;

[0053] The BIM modeling system creates the BIM model of the target building through the target building information collection system;

[0054] The construction schedule preparation system is used to store the construction s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a 4D simulation system based on a BIM real-time construction model. The 4D simulation system comprises a target building information acquisition system, a BIN modeling system,a construction progress planning system, a model and progress link processing system and a 4D simulation real-time construction model display system. In the present invention, information collection is carried out on the actual construction progress of a target building; meanwhile, construction progress plan data is collected; the construction progress plan data is updated to the BIM model of thetarget building; three-dimensional display of construction cleaning of the target building is dynamically achieved, the actual state of the target building is accurately reflected, informatization, integration and visualization management of the construction progress, resources, cost and site of the target building are achieved, the construction efficiency is improved, the construction period is shortened, and the cost is saved.

Description

technical field [0001] The invention relates to the technical field of a 4D simulation system of a real-time construction model, in particular to a 4D simulation system based on a BIM real-time construction model. Background technique [0002] The core of BIM is to establish a virtual three-dimensional model of architectural engineering and use digital technology to provide this model with a complete architectural engineering information library that is consistent with the actual situation. The information library not only contains geometric information describing building components, professional attributes and The state information also includes the state information of non-component objects. 4D technology is to add the "time" variable to the traditional 3D printing technology, which not only includes the three dimensions of 3D length, width and height, but also adds a time dimension. The printed objects can self-adjust intelligently in terms of shape and structure over ti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q10/06G06Q50/08
CPCG06Q10/0633G06Q50/08G06F30/13
Inventor 白燕川
Owner 死海旅游度假有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products