Project workload assessment system and method based on agile management and development
An evaluation system and workload technology, applied in the field of project workload evaluation system based on agile management development, can solve problems such as see-saw events, delays in project progress, and complicated time determination, so as to improve the accuracy of time and avoid unsmooth information , the effect of saving offline time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] combined with figure 1 , the present embodiment proposes a project workload evaluation system based on agile management development, the evaluation system includes a training module 10, a data storage module 20, a data analysis module 30, and a general control service module 40;
[0066] The training module 10 collects the construction period evaluation information of the original project and stores it in the data storage module 20;
[0067] The data storage module 20 transmits the construction period evaluation information of the original project to the data analysis module 30;
[0068] The data analysis module 30 analyzes the construction period evaluation information of the original project, and transmits the analysis data to the general control service module 40;
[0069] The general control service module 40 studies the analysis data of the data analysis module 30, and obtains the construction period evaluation error coefficient of the actual construction period a...
Embodiment 2
[0088] combined with figure 2 , this embodiment proposes a project workload evaluation method based on agile management development, the evaluation method:
[0089] First, based on the evaluation information of the original project’s construction period, the basic idea of calculating the construction period is obtained by using big data intelligent analysis. By storing the data of different types of projects, using the method of artificial intelligence learning, after analogy and sorting, the actual construction period and the construction period of the estimated construction period are obtained. Evaluation error coefficient;
[0090] Then, based on the basic idea of calculating the construction period, analyze the type and data of the new project, and compare the original project with the new project of the same type to obtain the required research and development period of the new project. After accumulating all the estimated time, multiply it by the construction peri...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com