Electric check valve and zero cold water control system comprising same
A control system and shut-off valve technology, applied in the direction of valve operation/release device, valve details, multi-way valve, etc., can solve the problems of low production cost, insufficient heating, etc., achieve low material cost, save material, and reduce volume Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] like Figure 6 As shown, the working mode of single cycle heating includes the following steps:
[0033] 1. Judging whether a single loop has started, if the judgment result is yes, then jump to step 2; if the judgment result is no, then execute step 1 in a loop.
[0034] 2. The main controller of the water heater communicates with the intelligent control system and sends out the cut-off temperature data T.
[0035] 3. The electric shut-off valve is opened, the water pump starts to run, and the water heater heats the circulation pipeline.
[0036] 4. Determine whether the temperature detected by the temperature-sensing probe at the farthest water point reaches the cut-off temperature for 3 seconds or more. If the judgment result is yes, go to step 5; if the judgment result is no, execute step 4 in a loop.
[0037] 5. The electric shut-off valve is closed, the water pump stops, and the water heater stops working. Go to step 1.
Embodiment 2
[0039] like Figure 7 As shown, the working mode of all-day circulation heating includes the following steps:
[0040] 1. Judging whether the all-day cycle is enabled, if the judgment result is yes, then jump to step 2; if the judgment result is no, then execute step 1 in a loop.
[0041] 2. The main controller of the water heater communicates with the intelligent control system and sends out the cut-off temperature data T.
[0042] 3. The electric shut-off valve is opened, the water pump starts to run, and the water heater heats the circulation pipeline.
[0043] 4. Determine whether the temperature detected by the temperature-sensing probe at the farthest water point reaches the cut-off temperature for 3 seconds or more. If the judgment result is yes, go to step 5; if the judgment result is no, execute step 4 in a loop.
[0044] 5. The electric stop valve is closed, the water pump stops, and the water heater stops working.
[0045] 6. Judging whether the temperature of th...
Embodiment 3
[0047] like Figure 8 As shown, the appointment hydronic heating working method includes the following steps:
[0048]1. Judging whether the reservation cycle is enabled, if the judgment result is yes, then jump to step 2; if the judgment result is no, then execute step 1 in a loop.
[0049] 2. The main controller of the hot water judges whether it is currently within the reserved time period. If the judgment result is yes, then jump to step 3; if the judgment result is no, then execute step 2 in a loop.
[0050] 3. The main controller of the water heater communicates with the intelligent control system and sends out the cut-off temperature data T.
[0051] 4. The electric shut-off valve is opened, the water pump starts to run, and the water heater heats the circulation pipeline.
[0052] 5. The farthest water point temperature sensor detects whether the temperature reaches the cut-off temperature for 3 seconds or more. If the judgment result is yes, then jump to step 6; if ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com