Integrated optimization method for dispatching and controlling high-speed railway trains under temporary speed limit
A temporary speed limit, train technology, applied in railway car body components, railway signal and safety, transportation center control system, etc., can solve the problem of reducing operation recovery ability, no train driving control details are taken into account, and global optimization cannot be guaranteed. solution, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0127]An embodiment of the present invention provides a method for integrating operation adjustment and driving control of a high-speed railway train under a temporary speed limit. The method mainly includes: establishing an integrated optimization model of train operation adjustment and driving control under the condition of temporary speed limit according to the topological structure and signal system characteristics of China's high-speed railway line, temporary speed limit information and train dynamics characteristics, the integrated optimization model Including: train temporary speed limit constraint model, train dynamics model based on discrete distance, train arrival and departure time model, train running interval calculation model based on track section locking time, track section capacity constraint model and objective function model; A mixed integer programming algorithm is used to solve the integrated optimization model, obtain an optimized train operation adjustmen...
Embodiment 2
[0239] According to the method of the embodiment of the present invention, the adjusted train running diagram with track section locking time is as follows: Figure 5 As shown, its corresponding train running curve is shown in Figure 6(a)(b)(c)(d). The abscissa in Figure 6 is the operating time of the high-speed railway line, from 6:00 p.m. to 6:50 p.m., and the ordinate is the space, that is, the block zone. The gray blocks in Figure 6 represent the locking time in the block zone. In Fig. 6, the abscissa is the space, that is, the block partition, and the ordinate is the speed of the train (the unit is m / s).
[0240] In summary, the embodiment of the present invention realizes the automatic preparation of the optimized train operation adjustment plan and the acquisition of the recommended speed curve for high-speed railway trains under the condition of temporary speed limit disturbance, and has the following advantages:
[0241] 1. The automatically compiled operation adjust...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com