Curtain grouting construction method
A construction method and curtain grouting technology, applied in the field of dam body repair, can solve problems such as low efficiency and achieve the effect of increasing the grouting speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] This specific embodiment is only an explanation of the present invention, and it does not limit the present invention. Those skilled in the art can make modifications without creative contribution to the present embodiment as needed after reading this specification, but as long as the rights of the present invention are used All claims are protected by patent law.
[0028] 1) Drilling positioning: The drilling position is based on the design layout principle, and the total station combined with the steel ruler can be used for setting out. Drilling hole row spacing: According to the production test situation, detect the slurry diffusion range, and determine the optimal hole row spacing for curtain grouting drilling. Generally, 2-3m should be selected, and it should not be greater than 5m. The hole diameter of the hole is φ110~130mm.
[0029] Since the hole spacing of the curtain grouting hole is small, the vertical axis angle of the drilling rig should be strictly corre...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com