Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Second lining integrated complete set tool construction equipment and application method

A technology of construction equipment and application method, which is applied in the direction of mining equipment, shaft equipment, shaft lining, etc., can solve problems such as difficulty in ensuring smooth fit between waterproof board and inner wall of tunnel, difficulty in ensuring laying quality, and slowing down construction progress. Improve the quality of laying, improve the efficiency of height adjustment, the effect of strong adaptability

Pending Publication Date: 2019-07-02
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. The construction of the second lining of the tunnel often uses segmented lining to complete the construction of the entire tunnel, and the equipment required for each process in the construction of the second lining of the tunnel is relatively large. The latter construction section, thus slowing down the construction progress
[0004] 2. In the construction of the second lining of the tunnel, when laying the waterproof board, usually only the laying device is used to complete the laying work on the inner wall of the tunnel. However, after the laying device has been used for a long time, it is difficult to guarantee its good laying quality, making it difficult to guarantee the waterproof board Flat fit with the inner wall of the tunnel, so as to affect the waterproof effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Second lining integrated complete set tool construction equipment and application method
  • Second lining integrated complete set tool construction equipment and application method
  • Second lining integrated complete set tool construction equipment and application method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] In order to better understand the present invention, the present invention will be further described below in conjunction with specific embodiments and accompanying drawings.

[0047] Such as Figure 1-Figure 9 As shown, a complete set of tooling construction equipment integrated with two linings, wherein the complete set of tooling construction equipment integrated with two linings includes a waterproof and drainage construction part 10, a window-by-window pouring part 20 for the second lining chute, and a molded grouting construction part for the vault 30 and the auxiliary moving part 40, the auxiliary moving part 40 is set along the direction parallel to the central axis of the bottom surface of the tunnel to be lined, and the auxiliary moving part 40 is provided with the waterproof and drainage construction part 10 from the inside to the outside, and the second lining chute is poured into the mold window by window The part 20 and the arch roof molded grouting constr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides second lining integrated complete set tool construction equipment and an application method. The second lining integrated complete set tool construction equipment comprises a water-proof and drainage construction part, a second lining sliding groove window-by-window in-mold casting part, a vault grouting construction part with a mold and an auxiliary moving part, the auxiliary moving part is arranged in the direction parallel to the central axis of the bottom surface of a tunnel to be lined, and the auxiliary moving part is provided with a waterproof and drainage construction part, a second lining groove window-by-window in-mold casting part and a vault grouting construction part with the mold from inside to outside in sequence; The auxiliary moving part is arrangedto include a double-row slide, a moving block, stand columns, cross beams and locking mechanisms; and the stand columns are configured as telescopic columns. The second lining integrated complete settool construction equipment can flexibly and conveniently transfer the equipment required for each construction process in the lining process so as to effectively ensure the continuous and efficient operation in the tunnel lining process, and at the same time assist in the tiling of waterproof boards in the laying process of the waterproof boards, thereby further improving the quality of the waterproof board laying and waterproof effect.

Description

technical field [0001] The invention relates to the technical field of tunnel secondary lining construction, in particular to a secondary lining integrated complete tooling construction equipment and an application method. Background technique [0002] At home and abroad, there are many construction methods for the secondary lining of tunnels, most of which are self-made inverted arch trestles and ordinary lining trolley construction methods. At present, with the standardized construction of tunnel engineering, the gradual improvement of various construction links and quality requirements, the completion acceptance is more stringent for the quality of tunnel engineering, and the construction process is more and more important, especially for some tunnels that intersect with important environmental resource protection. construction construction. However, the existing tunnel secondary lining construction has the following problems in actual use: [0003] 1. The construction ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21D11/38E21D11/40
CPCE21D11/10E21D11/38E21D11/381E21D11/40Y02E10/20
Inventor 龙亮黄新纪广军李永刚叶兆芳刘晓永刘道清
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products