A prefabricated soil gas well device and its preparation method and construction method
A gas well and soil technology, applied in measuring devices, sampling devices, instruments, etc., can solve the problems that affect the accuracy of detection results, the surrounding environment of the pollution source is complex, and it is not suitable for on-site construction, so as to shorten the construction period, fast installation, and scrub resistance. Good results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Example 1: figure 1 , The preform means a soil gas well, comprising an outer sleeve, the bottom of the base 1 is detachably connected to the outer tube 2, the outer sleeve 1 is connected with the base 2 or the separation is achieved by rotating operation; the outer sleeve 1 is provided with a first lumen sequentially quartz sand bottom 3, a first dry bentonite layer 4, a first layer 5 and the first bentonite slurry cement mortar layer 6, the first quartz sand 3 7 equipped with a first probe, the first inner layer of cement mortar 6 is inserted and is provided with an end portion 8 of the inner sleeve 8 of the inner sleeve said outer sleeve 1 extends upwardly within the inner sleeve 8 is provided with downwardly extending first probe 7 and is connected to a first air duct 9, the upper end portion of the first guide pipe 9 is provided with a first valve 10, the inner sleeve 8 of the mouthpiece is provided with with the sealing cap 12, the base 1 is provided with the above-des...
Embodiment 2
[0073] Example 2: Figure 4 , The preform means a soil gas well, comprising an outer sleeve, the bottom of the base 1 is detachably connected to the outer tube 2, the outer sleeve 1 is connected with the base 2 or the separation is achieved by rotating operation; the outer sleeve 1 is provided with a first lumen sequentially quartz sand bottom 3, a first dry bentonite layer 4, a first layer 5 and the first bentonite slurry cement mortar layer 6, the first quartz sand 3 7 equipped with a first probe, the first interposed layer of cement mortar is provided with an end portion of the inner sleeve and the inner sleeve 8 8 6 projecting upwardly within the outer sleeve 1, the outer tube 1 quartz sand between the first 3 and the base 2 is provided with a set of extension layer structure 13, the bottom extension layer structure successively comprises a second quartz sand 13-1, 13-2 of the second layer of dry bentonite, a second bentonite slurry layer 13-3 and the third layer of dry bentoni...
PUM
Property | Measurement | Unit |
---|---|---|
height | aaaaa | aaaaa |
height | aaaaa | aaaaa |
height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com